Floyd Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Jun 2015 to May 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 9 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 18 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 17, 2023 | Completed final sign-off Mar 2024 | 565 Ortega St | (n) 1-hr fire-rated assemblies to walls and ceiling of breezeway. (n) nfpa 13-d sprinklers throughout breezeway under separate permit. install handrail at existing stairDetails
(n) 1-hr fire-rated assemblies to walls and ceiling of breezeway. (n) nfpa 13-d sprinklers throughout breezeway under separate permit. install handrail at existing stair | $43,930 |
| Jun 18, 2015 | Completed final sign-off Jun 2016 | 1501 Filbert St | move interior nonstructural walls at living room and bedroom. remodel extg powder room and bath, replace extg stairway. n/a for maher.Details
move interior nonstructural walls at living room and bedroom. remodel extg powder room and bath, replace extg stairway. n/a for maher. | $50,000 |