Flo Stor Engineering Inc
- Based in
- Hayward
- On San Francisco permits
- Feb 2009 to Jan 2016
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 282 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2014 | Never finaled issued Oct 2014, no final | 2001 Market St | remove (e) stairs leading to dock level, install pit & install southworth space saver scissor lift & associated guarding (fence & toe guards). install pass door into (e) roll up door. wire southworth lift table to 480 volt feeder.Details
remove (e) stairs leading to dock level, install pit & install southworth space saver scissor lift & associated guarding (fence & toe guards). install pass door into (e) roll up door. wire southworth lift table to 480 volt feeder. | $45,000 |