Fj Tile & Stone
- Based in
- San Jose
- On San Francisco permits
- Jun 2026 to Jun 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 6 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | In progress issued Jun 2026 | 388 Beale St | adding tile mosaic installed on an existing exterior concrete staircase, including an uncoupling & waterproof membrane, the tile mosaics on stair risers, new tread & landingtile, raising three existing area drains to ew surface grade, and adding k tile transition to the existing adjacent sidewalk.Details
adding tile mosaic installed on an existing exterior concrete staircase, including an uncoupling & waterproof membrane, the tile mosaics on stair risers, new tread & landingtile, raising three existing area drains to ew surface grade, and adding k tile transition to the existing adjacent sidewalk. | $44,000 |