Fixation Builders Inc
- Based in
- San Carlos
- On San Francisco permits
- Feb 2003 to Mar 2016
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 248 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2008 | Completed final sign-off Jul 2009 | 1519 Revere Av | legalize 2nd unit on ground floor. add insulation, new windows, repair structural fire damage at ground level per plans. replace rear elevation staircase and repair floor joists per plans.Details
legalize 2nd unit on ground floor. add insulation, new windows, repair structural fire damage at ground level per plans. replace rear elevation staircase and repair floor joists per plans. | $20,000 |