First Class Strutures
- Based in
- Santa Rosa
- On San Francisco permits
- May 2001 to Jan 2017
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 8 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2004 | Completed final sign-off Jul 2004 | 536 Hill St | remove dryrott architecture moldings, rails, porch & stairs. replace with new pressure treated &Details
remove dryrott architecture moldings, rails, porch & stairs. replace with new pressure treated & | $9,000 |
| Mar 22, 2002 | Completed final sign-off May 2002 | 543 28th St | comply w/ nov 200224670:hdr beam,joist, water,elec as needed, guardrails/hndrails staircaseDetails
comply w/ nov 200224670:hdr beam,joist, water,elec as needed, guardrails/hndrails staircase | $2,800 |