Back to bathroom remodel contractors
Firm Construction Company
- Based in
- South San Francisco
- On San Francisco permits
- Jun 2004 to Sep 2026
- Last 24 months
- 12 permits filed
84 permits since 2000: 32 completed, 11 in progress, 28 never finaled, 13 expired or cancelled.
Of the 28 never-finaled permits, 12 are 3 to 5 years old, 6 are 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 8 completed, 2 in progress, 9 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2026 | In progress filed May 2026, not yet issued | 34 Houston St | interior alteration to the (e) single family/residence includes all bedrooms, kitchen, living room, dining room, closet, & all bathrooms. electrical & plumbing will be affected due to alteration work includes windows & doors.Details
interior alteration to the (e) single family/residence includes all bedrooms, kitchen, living room, dining room, closet, & all bathrooms. electrical & plumbing will be affected due to alteration work includes windows & doors. | $125,000 |
| Jul 1, 2025 | In progress issued Jul 2025 | 256 Miramar Av | kitchen, bathroom, living room, dining room, hallway, closet & bedroom repairs due to water damage of interior of house. including plumbing & electrical repair. including insulation & sheetrock work.Details
kitchen, bathroom, living room, dining room, hallway, closet & bedroom repairs due to water damage of interior of house. including plumbing & electrical repair. including insulation & sheetrock work. | $80,000 |
| Jan 26, 2024 | Completed final sign-off Apr 2024 | 3100 Rivera St | 2/f: unpermitted half bath conversion to be legalized, 1/f: unpermited dry bar/bar sink to be legalized, 2/f: conversion of dining room to be bedroom (n) #5.Details
2/f: unpermitted half bath conversion to be legalized, 1/f: unpermited dry bar/bar sink to be legalized, 2/f: conversion of dining room to be bedroom (n) #5. | $30,000 |
| Apr 27, 2023 | Never finaled issued Apr 2023, no final | 646 10th Av | remove plaster from damaged walls and ceilings in kitchen,bathroom,living room(approx 200sf)and replace with 5/8x sheetrock.install new insulation in damaged areas.remove and repair dryrot around door and windows and non structural walls damages.replace all windows (u=0.3max)Details
remove plaster from damaged walls and ceilings in kitchen,bathroom,living room(approx 200sf)and replace with 5/8x sheetrock.install new insulation in damaged areas.remove and repair dryrot around door and windows and non structural walls damages.replace all windows (u=0.3max) | $40,000 |
| Apr 20, 2023 | Never finaled issued Apr 2023, no final | 646 10th Av | remodeling kitchen & bathroom & window repl (in-kind) 4 pcs @ rear & side of housing nonfacing frontage. incl rewiring the entire house to remove knob/tube. installation of new subpanel. remove and replace the furnace. includes gas line installation & insulation (same scope of work unit 646 & 648).Details
remodeling kitchen & bathroom & window repl (in-kind) 4 pcs @ rear & side of housing nonfacing frontage. incl rewiring the entire house to remove knob/tube. installation of new subpanel. remove and replace the furnace. includes gas line installation & insulation (same scope of work unit 646 & 648). | $150,000 |
| May 2, 2022 | Expired or cancelled cancelled Jul 2026 | 255 Capistrano Av | new addition of bathroom, hallway, and bedroom at garage level. removal of rear patio roof.Details
new addition of bathroom, hallway, and bedroom at garage level. removal of rear patio roof. | $50,000 |
| Jul 19, 2021 | Completed final sign-off Feb 2022 | 255 Capistrano Av | windows: r/r 2 wdw in bed 1, 1 wdw in bed 2, 3 wdw in kitchen,1 wdw bath, 3 wdw in living room, 1 wdw in dining. like for like & size. all front wdw alum-clad & all rear/side vinyl. u<=0.30Details
windows: r/r 2 wdw in bed 1, 1 wdw in bed 2, 3 wdw in kitchen,1 wdw bath, 3 wdw in living room, 1 wdw in dining. like for like & size. all front wdw alum-clad & all rear/side vinyl. u<=0.30 | $30,000 |
| Jun 4, 2021 | Completed final sign-off May 2022 | 458 Girard St | one bathroom and kitchen remodel: kitchen and bathroom electrical rewiring and plumbing. non struct: upgrade subpanel; replace bedroom windows (1) replace bathroom windows (1) replace (1) kitchen windowDetails
one bathroom and kitchen remodel: kitchen and bathroom electrical rewiring and plumbing. non struct: upgrade subpanel; replace bedroom windows (1) replace bathroom windows (1) replace (1) kitchen window | $50,000 |
| Apr 7, 2021 | Completed final sign-off Feb 2022 | 255 Capistrano Av | kitchen remodeling. bathroom remodeling. electrical work rewiring. plumbing bathroom/kitchen. subpanel upgrade.Details
kitchen remodeling. bathroom remodeling. electrical work rewiring. plumbing bathroom/kitchen. subpanel upgrade. | $45,000 |
| Apr 16, 2019 | Never finaled issued May 2023, no final | 188 Flournoy St | per ordiance 95-17, scope of work is to legalize an existing unwarranted accessory dwelling unit (e) non legal adu is a two bedroom, one bath unit.Details
per ordiance 95-17, scope of work is to legalize an existing unwarranted accessory dwelling unit (e) non legal adu is a two bedroom, one bath unit. | $25,545 |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 639 26th Av | water damage repair & remodel of kitchen, hallway bathroom (including sheetrock), laundry area, half bathroom, (e) furnace. everything in same location.Details
water damage repair & remodel of kitchen, hallway bathroom (including sheetrock), laundry area, half bathroom, (e) furnace. everything in same location. | $50,000 |
| Jan 17, 2018 | Completed final sign-off Dec 2018 | 1 Edgehill Wy | bathroom repair/remodeling due to water damage on 2nd floor level includes sheetrock, plumbing & electrical work.Details
bathroom repair/remodeling due to water damage on 2nd floor level includes sheetrock, plumbing & electrical work. | $10,000 |
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 969 Buena Vista Tr | renovation in unit #a, #b, #2, #f - remodel bathrooms, repair dryrot replace damaged window frames, replace floor / wall finishes. upgrade electrical system and re-pipe water line.Details
renovation in unit #a, #b, #2, #f - remodel bathrooms, repair dryrot replace damaged window frames, replace floor / wall finishes. upgrade electrical system and re-pipe water line. | $250,000 |
| Aug 11, 2017 | Never finaled issued Aug 2017, no final | 935 Buena Vista West Av | repair & remodel (e) bathroom by the foyer/lobby area on the 1st fl. rmeove & replace any dry rot lumbar. same location - no expansion.Details
repair & remodel (e) bathroom by the foyer/lobby area on the 1st fl. rmeove & replace any dry rot lumbar. same location - no expansion. | $15,000 |
| Oct 23, 2007 | Never finaled issued Oct 2007, no final | 841 Geneva Av | as per plan: 1) repair rear stair in kind same location. replace siding, re-roof and repair foundation. 2)repair interior wall in furnace room. 3) remodel (e) bathroom in master bedroom. 4) install (n) 4' x 4' window in kitchen.Details
as per plan: 1) repair rear stair in kind same location. replace siding, re-roof and repair foundation. 2)repair interior wall in furnace room. 3) remodel (e) bathroom in master bedroom. 4) install (n) 4' x 4' window in kitchen. | $3,000 |
| Aug 18, 2006 | Never finaled issued Aug 2006, no final | 811 Moultrie St | reference to app #200605242306/bathroom remodeling for both upstairs and downstairs including change shower valve and toilet bowl and bathroom fixtures/kchn remodeling upstair includes refacing cabinets and tiles intallation o kchn fixtures to comply with complaint #200672274Details
reference to app #200605242306/bathroom remodeling for both upstairs and downstairs including change shower valve and toilet bowl and bathroom fixtures/kchn remodeling upstair includes refacing cabinets and tiles intallation o kchn fixtures to comply with complaint #200672274 | $15,000 |
| Mar 15, 2006 | Completed final sign-off Sep 2006 | 287 Country Club Dr | convert extg family room to a new bedroom and master bedroom with new full bath per planDetails
convert extg family room to a new bedroom and master bedroom with new full bath per plan | $20,000 |
| Nov 29, 2005 | Completed final sign-off Jun 2006 | 188 Banks St | remove closet by living room,convert family room to bedroom,dry rot repair under bathroom,bedroom & closet area. work at 2/f levelDetails
remove closet by living room,convert family room to bedroom,dry rot repair under bathroom,bedroom & closet area. work at 2/f level | $15,680 |
| Nov 29, 2005 | Never finaled issued Nov 2005, no final | 463 Moscow St | first floor level: convert den into bedroom, instal new door. dry rotten under bathroom & bedroom , dry rot repair second floor level: remodel bathroom. as per plan - no structrual work.Details
first floor level: convert den into bedroom, instal new door. dry rotten under bathroom & bedroom , dry rot repair second floor level: remodel bathroom. as per plan - no structrual work. | $13,500 |
| Jun 2, 2005 | Expired or cancelled expired Nov 2009 | 121 Judson Av | additional 1 study room & computer room ,1 full bath, family room.Details
additional 1 study room & computer room ,1 full bath, family room. | $15,000 |
| Jun 1, 2005 | Expired or cancelled expired Dec 2006 | 382 Hearst Av | 2 additional bedrooms & 1 additional bathroom below basement level.1 bathroom remodeling in 2/fl levDetails
2 additional bedrooms & 1 additional bathroom below basement level.1 bathroom remodeling in 2/fl lev | $25,000 |
| May 27, 2005 | Never finaled issued May 2005, no final | 121 Judson Av | additional bathroom and kitchen remodeling in 2nd floor levelDetails
additional bathroom and kitchen remodeling in 2nd floor level | $10,000 |