Permit GraphShortlistSan Francisco building permits since 2000

Block 1635, lot 028A

648 10th Ave

City’s use
Multi-Family Residential
Built
1915
Stories
2
Units
2
Rooms
2 bathrooms
Building
3,112 sq ft
Lot
2,996 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

6 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 6, 2025In progress
issued May 2025
648 10th AvFirm Construction Companyto obtain final inspection for work approved udner pa#: 202309015828, 202306291226, and 202304276637. all work is complete.
Details
Permit
202505065879
Status
issued
Filed
May 6, 2025
Permit issued
May 6, 2025
Address
648 10th Av

to obtain final inspection for work approved udner pa#: 202309015828, 202306291226, and 202304276637. all work is complete.

Open the permit page

Sep 1, 2023Never finaled
issued Oct 2023, no final
646 10th AvFirm Construction Companyrevision to pa# 202306291226, (646/648)install new post and beam on kitchen area, (648a)install new post and beam on garage area.
Details
Permit
202309015828
Status
issued
Filed
Sep 1, 2023
Permit issued
Oct 4, 2023
Declared cost
$5,000
Address
646 10th Av

revision to pa# 202306291226, (646/648)install new post and beam on kitchen area, (648a)install new post and beam on garage area.

Open the permit page

$5,000
Jul 6, 2023Never finaled
issued Jul 2023, no final
648 10th AvFirm Construction Companyref pa#202306291226. add third unit new address; 648a 10th ve to block 1635 lot 028a
Details
Permit
M1231187
Status
issued
Filed
Jul 6, 2023
Permit issued
Jul 6, 2023
Address
648 10th Av

ref pa#202306291226. add third unit new address; 648a 10th ve to block 1635 lot 028a

Open the permit page

Jun 29, 2023Never finaled
issued Jul 2023, no final
646 10th AvFirm Construction Companyunits 646/648-convert closet to full bathrm, plumb/elec, replace dry rot/termite damaged wood (non sructural); 646-add (5)14in dome skylights; roof repair due to dry rot; unit 648a-convert closet to office rm, remodel kitchen, remodel bathrm, r/r subpanel, install new water heater, r/r window on
Details
Permit
202306291226
Status
issued
Filed
Jun 29, 2023
Permit issued
Jul 5, 2023
Declared cost
$50,000
Address
646 10th Av

units 646/648-convert closet to full bathrm, plumb/elec, replace dry rot/termite damaged wood (non sructural); 646-add (5)14in dome skylights; roof repair due to dry rot; unit 648a-convert closet to office rm, remodel kitchen, remodel bathrm, r/r subpanel, install new water heater, r/r window on

Open the permit page

$50,000
Apr 27, 2023Never finaled
issued Apr 2023, no final
646 10th AvFirm Construction Companyremove plaster from damaged walls and ceilings in kitchen,bathroom,living room(approx 200sf)and replace with 5/8x sheetrock.install new insulation in damaged areas.remove and repair dryrot around door and windows and non structural walls damages.replace all windows (u=0.3max)
Details
Permit
202304276637
Status
issued
Filed
Apr 27, 2023
Permit issued
Apr 27, 2023
Declared cost
$40,000
Address
646 10th Av

remove plaster from damaged walls and ceilings in kitchen,bathroom,living room(approx 200sf)and replace with 5/8x sheetrock.install new insulation in damaged areas.remove and repair dryrot around door and windows and non structural walls damages.replace all windows (u=0.3max)

Open the permit page

$40,000
Apr 20, 2023Never finaled
issued Apr 2023, no final
646 10th AvFirm Construction Companyremodeling kitchen & bathroom & window repl (in-kind) 4 pcs @ rear & side of housing nonfacing frontage. incl rewiring the entire house to remove knob/tube. installation of new subpanel. remove and replace the furnace. includes gas line installation & insulation (same scope of work unit 646 & 648).
Details
Permit
202304206142
Status
issued
Filed
Apr 20, 2023
Permit issued
Apr 20, 2023
Declared cost
$150,000
Address
646 10th Av

remodeling kitchen & bathroom & window repl (in-kind) 4 pcs @ rear & side of housing nonfacing frontage. incl rewiring the entire house to remove knob/tube. installation of new subpanel. remove and replace the furnace. includes gas line installation & insulation (same scope of work unit 646 & 648).

Open the permit page

$150,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Firm Construction Company (6)
Engineers
Devendra Singh Deshwal

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.