Fire Technologies
- Based in
- San Rafael
- On San Francisco permits
- Mar 2000 to Jul 2024
- Last 24 months
- 0 permits filed
152 permits since 2000: 100 completed, 25 never finaled, 27 expired or cancelled.
Of the 25 never-finaled permits, 5 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2006 | Completed final sign-off Aug 2006 | 2130 Pierce St | replace 5 painted prinklers in the bottom-1st floor kitchen, den ,bath, study, living rm with standard temp tyco 6bqr pend 5.6 k sin#ty3231Details
replace 5 painted prinklers in the bottom-1st floor kitchen, den ,bath, study, living rm with standard temp tyco 6bqr pend 5.6 k sin#ty3231 | $450 |