Back to kitchen remodel contractors
Fbn Construction
- Based in
- Salida
- On San Francisco permits
- Feb 2013 to Feb 2018
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 expired or cancelled. Typically 471 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2013 | Expired or cancelled expired Apr 2019 | 1451 Mariposa St | legalize (e) dwelling unit. change of use from r-3 to r-2. provide (n) smoke detectors. replace (e) outlets in kitchen, replace (e) light fixture in kitchen. provide (n) sprinkler system throughout per nfpa 13.Details
legalize (e) dwelling unit. change of use from r-3 to r-2. provide (n) smoke detectors. replace (e) outlets in kitchen, replace (e) light fixture in kitchen. provide (n) sprinkler system throughout per nfpa 13. | $5,000 |