Back to kitchen remodel contractors
Fatani Construction
- Based in
- Antioch
- On San Francisco permits
- Sep 2022 to Sep 2022
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 expired or cancelled. Typically 41 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2022 | Expired or cancelled expired Jul 2026 | 2238 15th St | remove wall between kitchen and dining rm. add 1/2 bath across from main bath. remove non load bearing wall between toilet rm and bath. relocate bath fixtures in main bath. remove replace kitchen cabinets, island cabinet. new wall heater in hallway. comply with nov 200667339Details
remove wall between kitchen and dining rm. add 1/2 bath across from main bath. remove non load bearing wall between toilet rm and bath. relocate bath fixtures in main bath. remove replace kitchen cabinets, island cabinet. new wall heater in hallway. comply with nov 200667339 | $85,000 |