Back to kitchen remodel contractors
Fairview Restoration Inc.
- Based in
- San Jose
- On San Francisco permits
- Jan 2016 to Oct 2025
- Last 24 months
- 3 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 747 Minna St | emergency fire repair(<50%):door dmg by fd;door cracked;casing dmg by fd;smoke odor dmg; kitchen:door between entry/kitchen removed by fd;bathroom: full gut;bathroom:swollen vanity;bathroom;door swollen; bathroom: drywall dmg by fd;entry:fct wet need remove. entry:full gut by sp due to smokeDetails
emergency fire repair(<50%):door dmg by fd;door cracked;casing dmg by fd;smoke odor dmg; kitchen:door between entry/kitchen removed by fd;bathroom: full gut;bathroom:swollen vanity;bathroom;door swollen; bathroom: drywall dmg by fd;entry:fct wet need remove. entry:full gut by sp due to smoke | $30,000 |