Back to kitchen remodel contractors
F C O General Construction
- Based in
- Hayward
- On San Francisco permits
- Jul 2015 to Dec 2023
- Last 24 months
- 0 permits filed
15 permits since 2000: 15 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 8 days from filing to permit and 946 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2022 | Completed final sign-off Aug 2022 | 2761 34th Av | legalize unpermitted rear deck & stairs. deck 13'-8" x 12'-8" in dimension & is 4'-5" high above grade. legalize installation of 6'-8"w x 7'-0" h glass sliding door @ kitchen. kitchen remodel fees already paid under pa 2022-0121-6380Details
legalize unpermitted rear deck & stairs. deck 13'-8" x 12'-8" in dimension & is 4'-5" high above grade. legalize installation of 6'-8"w x 7'-0" h glass sliding door @ kitchen. kitchen remodel fees already paid under pa 2022-0121-6380 | $5,000 |
| Jan 21, 2022 | Completed final sign-off Aug 2022 | 2761 34th Av | kitchen remodel, no change to (e) floor planDetails
kitchen remodel, no change to (e) floor plan | $30,000 |
| Aug 2, 2019 | Completed final sign-off Jan 2024 | 3795 Market St | revision to pa 2018-0905-9138 replace existing vinyl or aluminum windows at upper unit kitchen and master bath with clad wood windows. replace (e) aluminum with aluminum wood clad casementDetails
revision to pa 2018-0905-9138 replace existing vinyl or aluminum windows at upper unit kitchen and master bath with clad wood windows. replace (e) aluminum with aluminum wood clad casement | $2,000 |
| Apr 9, 2019 | Completed final sign-off Jan 2024 | 3795 Market St | revision to permit #201809059138. remodel of lower unit kitchen and bath. new rear door and window.Details
revision to permit #201809059138. remodel of lower unit kitchen and bath. new rear door and window. | $20,000 |
| Sep 5, 2018 | Completed final sign-off Jan 2024 | 3795 Market St | kitchen and bath remodel, add (n) master bath at 2nd flr. new guardrails at deck and replace lower deck posts. terrace rear yard. no change to front elevation, no increase to building areaDetails
kitchen and bath remodel, add (n) master bath at 2nd flr. new guardrails at deck and replace lower deck posts. terrace rear yard. no change to front elevation, no increase to building area | $120,000 |
| Jul 3, 2018 | Completed final sign-off Feb 2021 | 142 Eastwood Dr | revision to app#201612155143 widen side porch of kitchen. move gas meter. replace topping at front porch.Details
revision to app#201612155143 widen side porch of kitchen. move gas meter. replace topping at front porch. | $2,000 |
| Dec 16, 2016 | Completed final sign-off Feb 2021 | 142 Eastwood Dr | remodel existing kitchen, bath, laundry new interior stair to basement. new skylights. new stairs to side yard, replace existing windows at side yard. replace existing windows at sides and rear with new dual pane windows. remove existing concrete patio, replace with permeable pavers. no change toDetails
remodel existing kitchen, bath, laundry new interior stair to basement. new skylights. new stairs to side yard, replace existing windows at side yard. replace existing windows at sides and rear with new dual pane windows. remove existing concrete patio, replace with permeable pavers. no change to | $100,000 |
| Jul 21, 2016 | Completed final sign-off Mar 2022 | 3378 22nd St | remodel of (e) 2 floor condominium. remodel (e) ground floor to create media room, laundry, study & bath. in-fill addition under sun room for new connecting stair between ground floor & upper level. remodel of kitchen & upper level bath. expand garage for 2-car parking. no change to front facade.Details
remodel of (e) 2 floor condominium. remodel (e) ground floor to create media room, laundry, study & bath. in-fill addition under sun room for new connecting stair between ground floor & upper level. remodel of kitchen & upper level bath. expand garage for 2-car parking. no change to front facade. | $250,000 |
| Jul 27, 2015 | Completed final sign-off Oct 2015 | 481 Clementina St | unit #e: remodel kitchen: replacing cabinets, counter top, new led lighting. remodel two bathrooms: replacing exhaust fans, wall tiles, toilets and sinks. new shower. no walls to be moved, no structural work. all fire reated assemblies to be maintained.Details
unit #e: remodel kitchen: replacing cabinets, counter top, new led lighting. remodel two bathrooms: replacing exhaust fans, wall tiles, toilets and sinks. new shower. no walls to be moved, no structural work. all fire reated assemblies to be maintained. | $40,000 |