Back to kitchen remodel contractors
F C Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2017 to Oct 2026
- Last 24 months
- 37 permits filed
111 permits since 2000: 67 completed, 24 in progress, 11 never finaled, 9 expired or cancelled.
Of the 11 never-finaled permits, 10 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 17 completed, 8 in progress, 5 never finaled, 2 expired or cancelled. Typically 38 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 714 Church St | kitchen remodel in kind. no changes in layout. redo flooringDetails
kitchen remodel in kind. no changes in layout. redo flooring | $25,000 |
| Feb 15, 2026 | In progress filed Feb 2026, not yet issued | 579 05th Av | comply w/nov 202538644 & 202542838, rebuild 3-flrs fire damaged bldg (unit 579 & 579a). unit 579: add new bathroom & family room @ 1/f, replace 2-fixture bath w/ 3-fixture @ 1/f, add wetbar @ 1/f, replace tub w/shower @ 2/f. unit 579a: ext kitchen/living/dining to bdrm #3, replace tub w/shower @ 3/fDetails
comply w/nov 202538644 & 202542838, rebuild 3-flrs fire damaged bldg (unit 579 & 579a). unit 579: add new bathroom & family room @ 1/f, replace 2-fixture bath w/ 3-fixture @ 1/f, add wetbar @ 1/f, replace tub w/shower @ 2/f. unit 579a: ext kitchen/living/dining to bdrm #3, replace tub w/shower @ 3/f | $168,000 |
| Dec 18, 2025 | In progress issued May 2026 | 3250 Folsom St | lv1: infill within existing footprint and into garage to add primary suite, stair access from foyer. lv2: update bathroom/kitchen; reconfigure stair for code compliance.lv3: convert unoccupied attic to a story, add bedroom and bathroom. whole house reroof, replace windows, structural upgrades mepDetails
lv1: infill within existing footprint and into garage to add primary suite, stair access from foyer. lv2: update bathroom/kitchen; reconfigure stair for code compliance.lv3: convert unoccupied attic to a story, add bedroom and bathroom. whole house reroof, replace windows, structural upgrades mep | $522,000 |
| Jul 18, 2025 | In progress issued Jul 2025 | 2131 28th Av | 2nd flr kitchen & bathroom like to like remodel. convert ground flr storage space into living space(687 sqft):add one family room, one bedroom, one full bath and one half bath. relocate furnace, replace tank water heater to tankless water heater.Details
2nd flr kitchen & bathroom like to like remodel. convert ground flr storage space into living space(687 sqft):add one family room, one bedroom, one full bath and one half bath. relocate furnace, replace tank water heater to tankless water heater. | $127,000 |
| May 28, 2025 | Completed final sign-off Sep 2025 | 582 22nd Av | remodel 1 bathroom and kitchen on second fl in kind. no moving walls. bathroom approx. 40 sq ft. kitchen approx 96 sq ft.Details
remodel 1 bathroom and kitchen on second fl in kind. no moving walls. bathroom approx. 40 sq ft. kitchen approx 96 sq ft. | $40,000 |
| May 21, 2025 | In progress issued Jan 2026 | 1287 42nd Av | demo (e) rear yard deck and expand 1st & 2nd flr to buildable line; relocate (e) kitchen/dining/family room 2nd fl to 1st fl. make a master bedroom after relocation. add a bedroom to 2nd fl and change (e) living to bedroom. alter (e) stairs. 1st &2nd flr. bath remodel. relocate laundry to 2nd floor.Details
demo (e) rear yard deck and expand 1st & 2nd flr to buildable line; relocate (e) kitchen/dining/family room 2nd fl to 1st fl. make a master bedroom after relocation. add a bedroom to 2nd fl and change (e) living to bedroom. alter (e) stairs. 1st &2nd flr. bath remodel. relocate laundry to 2nd floor. | $100,000 |
| Apr 16, 2025 | In progress issued May 2025 | 2339 39th Av | 1st fl: add office, bedroom and bathroom. enclose entryway 2nd fl: remodel (e) kitchen and remove dividing wall btwn dining and kitchen. remodel two existing bathrooms. replace doors and windows at rear wall. refinish flooringDetails
1st fl: add office, bedroom and bathroom. enclose entryway 2nd fl: remodel (e) kitchen and remove dividing wall btwn dining and kitchen. remodel two existing bathrooms. replace doors and windows at rear wall. refinish flooring | $200,000 |
| Feb 27, 2025 | Completed final sign-off May 2025 | 1955 42nd Av | remodel kitchen and bathroom on 2nd floor in kind. no alteration to (e) layout. reuse (e) plumbing and electrical circuit.Details
remodel kitchen and bathroom on 2nd floor in kind. no alteration to (e) layout. reuse (e) plumbing and electrical circuit. | $15,000 |
| Jan 14, 2025 | In progress issued Mar 2025 | 1707 40th Av | on ground level: add one family room and one full bath. on 2nd floor: kitchen remodel and bath room remodel. upgrade electrical main to 200 amp.Details
on ground level: add one family room and one full bath. on 2nd floor: kitchen remodel and bath room remodel. upgrade electrical main to 200 amp. | $95,000 |
| Nov 4, 2024 | In progress issued Jan 2025 | 448 Judson Av | resolve nov case from previous owner: 202177415; demolish unpermitted works at basement. kitchen remodel, remove non-load bearing wall. add new bathroom and existing bathroom remodel. electrical rewire for kitchen/bathrooms per current electrical code.Details
resolve nov case from previous owner: 202177415; demolish unpermitted works at basement. kitchen remodel, remove non-load bearing wall. add new bathroom and existing bathroom remodel. electrical rewire for kitchen/bathrooms per current electrical code. | $60,000 |
| May 21, 2024 | Completed final sign-off Dec 2024 | 659 02nd Av | kitchen remodel (inkind) finishing only. remodel 2 bathrooms (inkind), finishing only, install new flooring. paint exterior walls. repair drywall for electrical work. no alteration to layout and framing in kind remodelDetails
kitchen remodel (inkind) finishing only. remodel 2 bathrooms (inkind), finishing only, install new flooring. paint exterior walls. repair drywall for electrical work. no alteration to layout and framing in kind remodel | $70,000 |
| Dec 22, 2023 | Completed final sign-off Mar 2024 | 300 03rd St | unit # 711: (1) kitchen remodel, (1) bathroom remodel, finish remodel, replace trim and new light fixturesDetails
unit # 711: (1) kitchen remodel, (1) bathroom remodel, finish remodel, replace trim and new light fixtures | $2,000 |
| Nov 21, 2023 | Completed final sign-off Sep 2025 | 2347 39th Av | develop gr/f rooms for a guest bedroom, family rm, full bath and laundry room, remove e utility stairs btw flrs, remodel kitchen on 2/f: open wall add beam, remodel 2 e baths on 2/f, create a masterbedrm ensuite, insulate throughout where accessible. general mep upgrades.Details
develop gr/f rooms for a guest bedroom, family rm, full bath and laundry room, remove e utility stairs btw flrs, remodel kitchen on 2/f: open wall add beam, remodel 2 e baths on 2/f, create a masterbedrm ensuite, insulate throughout where accessible. general mep upgrades. | $165,992 |
| Oct 30, 2023 | In progress issued Sep 2024 | 201 Christopher Dr | interior layout change on the 1/f and 2/f, upstairs changes include kitchen remodel and removal of wall and installing skylights, downstairs remodel will include bedroom, bathroom, walk-in closet, entry way, laundry area and bonus area, the central heating system and water heater will be replaceDetails
interior layout change on the 1/f and 2/f, upstairs changes include kitchen remodel and removal of wall and installing skylights, downstairs remodel will include bedroom, bathroom, walk-in closet, entry way, laundry area and bonus area, the central heating system and water heater will be replace | $100,000 |
| May 30, 2023 | Never finaled issued Aug 2023, no final | 294 Hale St | 1/f: add a bedroom & bathroom. add interior stairwell connecting to 2/f. 2/f: (e) bath resurface including relocate one window. remove walls per plan and remodel living room. switch (e) kitchen with dining room.Details
1/f: add a bedroom & bathroom. add interior stairwell connecting to 2/f. 2/f: (e) bath resurface including relocate one window. remove walls per plan and remodel living room. switch (e) kitchen with dining room. | $80,000 |
| Nov 7, 2022 | Completed final sign-off May 2023 | 15 Stillman St | remodel 1 unit lower level (1st fl) relocate and remodel kitchen and living areas open in 20 lin ft. of (e) wall add 2 baths remodel 2 (e) baths, total 4 baths, 2 bedrooms, 1 den, 1 office, 1 laundry closet no additonal area added (e) furnance and water heater in basement upgrad mepDetails
remodel 1 unit lower level (1st fl) relocate and remodel kitchen and living areas open in 20 lin ft. of (e) wall add 2 baths remodel 2 (e) baths, total 4 baths, 2 bedrooms, 1 den, 1 office, 1 laundry closet no additonal area added (e) furnance and water heater in basement upgrad mep | $96,328 |
| Oct 21, 2022 | Completed final sign-off Apr 2023 | 149 Robinhood Dr | remodel one kitchen & half bath in kind. finishing remodel only. no alteration to existing rough electrical, plumbing & mechanical work. non structural.Details
remodel one kitchen & half bath in kind. finishing remodel only. no alteration to existing rough electrical, plumbing & mechanical work. non structural. | $20,000 |
| Oct 14, 2022 | Never finaled issued Aug 2023, no final | 81 San Felipe Av | 2/f: relocate (e) bathroom & new walkin closet.1/f: relocate & remodel (e) kitchen, bath, bed & dining rooms.reconfig (e) laundry & powder room. basement fl: (n) master bed/bath,reconfig (e) master bed/bath. new powder rm,office, remodel (e) family room, sub-basement floor: convert storage to mediaDetails
2/f: relocate (e) bathroom & new walkin closet.1/f: relocate & remodel (e) kitchen, bath, bed & dining rooms.reconfig (e) laundry & powder room. basement fl: (n) master bed/bath,reconfig (e) master bed/bath. new powder rm,office, remodel (e) family room, sub-basement floor: convert storage to media | $165,000 |
| Oct 4, 2022 | Completed final sign-off Jan 2023 | 850 Clement St | retile kitchen 325 sq ft. no change and alteration to plumbing and electrical layout.Details
retile kitchen 325 sq ft. no change and alteration to plumbing and electrical layout. | $3,500 |
| Jul 19, 2022 | Expired or cancelled cancelled Jan 2026 | 852 Clement St | retile 283 sqft of kitchen flooring. no alteration to layout, plumbing or electrical work.Details
retile 283 sqft of kitchen flooring. no alteration to layout, plumbing or electrical work. | $2,000 |
| Jul 18, 2022 | Completed final sign-off Jan 2023 | 1722 29th Av | 2/f: kitchen remodel. r/r (e) kitchen cabs,sink,d/w, stove & add island. install new recess lights.reconfig 1 bath to 2 baths.infill bathroom lightwell.replce front & rear windows in-kind. 1/f: reconfig garage to add 1 b3ed, 1 bathroom, family room.Details
2/f: kitchen remodel. r/r (e) kitchen cabs,sink,d/w, stove & add island. install new recess lights.reconfig 1 bath to 2 baths.infill bathroom lightwell.replce front & rear windows in-kind. 1/f: reconfig garage to add 1 b3ed, 1 bathroom, family room. | $120,000 |
| May 26, 2022 | Never finaled issued May 2022, no final | 72 Tucker Av | demo existing ground floor and bring up to code. remove wall between kitchen and living room. remodel existing bathroom. add a new bathroom. remodel kitchen. update electrical work.Details
demo existing ground floor and bring up to code. remove wall between kitchen and living room. remodel existing bathroom. add a new bathroom. remodel kitchen. update electrical work. | $50,000 |
| Mar 21, 2022 | Completed final sign-off Jan 2023 | 658 40th Av | remodel extg kitchen, remodel extg bathroom. infill skylights as shown on plan.Details
remodel extg kitchen, remodel extg bathroom. infill skylights as shown on plan. | $40,000 |
| Feb 28, 2022 | Completed final sign-off May 2023 | 2166 25th Av | kitchen remodel. remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island, and install recessed lights. convert (e) window to sliding door. add rear deck in master bedroom.Details
kitchen remodel. remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island, and install recessed lights. convert (e) window to sliding door. add rear deck in master bedroom. | $60,000 |
| Sep 23, 2021 | Completed final sign-off Feb 2022 | 476 Filbert St | install new tiles to kitchen 187 sq ft. install new flooring 118 sq ft. paint interior walls.Details
install new tiles to kitchen 187 sq ft. install new flooring 118 sq ft. paint interior walls. | $8,000 |
| Oct 16, 2020 | Completed final sign-off Dec 2021 | 1590 33rd Av | 2/f: remodel kitchen counter per plans, remove walls between dining, media and living room for open design. add new sliding door & counter in courtyard. add new closet & new bath in (e) bedroom. infill lightwell on 2/f.Details
2/f: remodel kitchen counter per plans, remove walls between dining, media and living room for open design. add new sliding door & counter in courtyard. add new closet & new bath in (e) bedroom. infill lightwell on 2/f. | $30,000 |
| Dec 31, 2019 | Never finaled issued Apr 2022, no final | 2215 38th Av | 2-story rear addition & recongigure rooms layout at ground & 2nd fl; including 1 new office, study, laundry & bath at ground fl. add 1 new bath & reconfigure (e) kitchen & bath at 2nd fl.Details
2-story rear addition & recongigure rooms layout at ground & 2nd fl; including 1 new office, study, laundry & bath at ground fl. add 1 new bath & reconfigure (e) kitchen & bath at 2nd fl. | $110,000 |
| Aug 27, 2019 | Expired or cancelled expired Aug 2023 | 85 Pope St | legalize 1st fl dwelling unit per ordinance #43-14. unit renovation add a bedroom, a full bath, kitchen renovateDetails
legalize 1st fl dwelling unit per ordinance #43-14. unit renovation add a bedroom, a full bath, kitchen renovate | $35,000 |
| Feb 20, 2019 | Completed final sign-off Dec 2024 | 193 Boutwell St | to comply w/ nov 201805581, legalization second dwelling unit installed without permit, per unit legalization ord 43-14, legalize (e) kitchen and bathrooms at ground floor, add (n) door at ground floor for (n) entrance, convert garage door to standard garage door.Details
to comply w/ nov 201805581, legalization second dwelling unit installed without permit, per unit legalization ord 43-14, legalize (e) kitchen and bathrooms at ground floor, add (n) door at ground floor for (n) entrance, convert garage door to standard garage door. | $59,000 |
| Nov 14, 2018 | Completed final sign-off Jul 2019 | 2571 39th Av | remodel ground fl porch, garage area, remodel 2nd fl. kitchen, master bathroom, adding new bathroomDetails
remodel ground fl porch, garage area, remodel 2nd fl. kitchen, master bathroom, adding new bathroom | $95,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 2676 Great Hy | add one bedroom & one full bath on the ground floor. remodel (e) kitchen & one full bathroom. add one full bathroom at 2nd floor. replace front window, window to be wood aluminum clad to match in-kind.Details
add one bedroom & one full bath on the ground floor. remodel (e) kitchen & one full bathroom. add one full bathroom at 2nd floor. replace front window, window to be wood aluminum clad to match in-kind. | $60,000 |
| Jun 13, 2017 | Completed final sign-off Aug 2017 | 2219 38th Av | remodle (e) bathroom & kitchen @ 2nd floor. remove (e) non-structural wall @ kitchen area.Details
remodle (e) bathroom & kitchen @ 2nd floor. remove (e) non-structural wall @ kitchen area. | $20,000 |