Expressions General Remodel
- Based in
- Concord
- On San Francisco permits
- May 2014 to Mar 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 997 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2015 | Completed final sign-off Oct 2017 | 58 Valley St | replace deck. swap door and window at kitchen on ground floor. outdoors storage shed 96" above grade at all points. no more than 100 sq. ft - replace front entry door, like-for-like.Details
replace deck. swap door and window at kitchen on ground floor. outdoors storage shed 96" above grade at all points. no more than 100 sq. ft - replace front entry door, like-for-like. | $5,000 |