Back to bathroom remodel contractors
Expressions General Remodel
- Based in
- Concord
- On San Francisco permits
- May 2014 to Mar 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 171 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2022 | Completed final sign-off Jan 2023 | 761 Panorama Dr | remodel of rear portion of (e) g/f. build a bathroom, laundry & bedroom in ground floor. add new windows (alum clad wood) on south side. minor (n) flr framing an dsingle conc. pad ftg.Details
remodel of rear portion of (e) g/f. build a bathroom, laundry & bedroom in ground floor. add new windows (alum clad wood) on south side. minor (n) flr framing an dsingle conc. pad ftg. | $40,000 |
| Mar 7, 2018 | Completed final sign-off Apr 2018 | 1945 Washington St | #605: (2) bathroom remodel. new shower, vanity, exhaust fan. kitchen cabinets, refacing only. no alteration of any wall or change of existing floor plan. maher naDetails
#605: (2) bathroom remodel. new shower, vanity, exhaust fan. kitchen cabinets, refacing only. no alteration of any wall or change of existing floor plan. maher na | $15,000 |
| May 22, 2014 | Never finaled issued May 2014, no final | 16 Joy St | kitchen remodel - new appliances, new outlets, new floor, new cabinets, counter tops. bathroom remodel - relocate washer/dryer, new outlets, new floors, minor new shower, vanity, toilet, new faucet.Details
kitchen remodel - new appliances, new outlets, new floor, new cabinets, counter tops. bathroom remodel - relocate washer/dryer, new outlets, new floors, minor new shower, vanity, toilet, new faucet. | $19,500 |