Excelsior Building Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2016 to Jul 2023
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 39 days from filing to permit and 306 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2022 | Never finaled issued Sep 2023, no final | 66 Gladstone Dr | (n) 1 bedrm, 1 bath adu at lower level. main home remodel & addition. upper level work includes (n) bathroom, office/bedroom, & stairs. lower level work includes (n) laundry area. front yard work, (n) patio & entryway for adu, replace (e) driveway w/ permeable paving.Details
(n) 1 bedrm, 1 bath adu at lower level. main home remodel & addition. upper level work includes (n) bathroom, office/bedroom, & stairs. lower level work includes (n) laundry area. front yard work, (n) patio & entryway for adu, replace (e) driveway w/ permeable paving. | $180,000 |
| Apr 10, 2017 | Completed final sign-off Mar 2018 | 1111 Munich St | grnd flr: remodel (e) unfurnished room, enclose (e) laundry, relocate toilet & create new full bath, build mudroom. 2nd flr: remodel kitchen, entry & breakfast room. remodel (e) interior stairsDetails
grnd flr: remodel (e) unfurnished room, enclose (e) laundry, relocate toilet & create new full bath, build mudroom. 2nd flr: remodel kitchen, entry & breakfast room. remodel (e) interior stairs | $150,000 |
| Dec 22, 2016 | Completed final sign-off Oct 2017 | 720 Laguna Honda Bl | 1/f: add 2 bedrooms, 1 den, 1 full bathrom and laundry room. reconfigure internal stairs. replace window and new slider at rear.Details
1/f: add 2 bedrooms, 1 den, 1 full bathrom and laundry room. reconfigure internal stairs. replace window and new slider at rear. | $80,000 |