Excel Painting And Restoration
- Based in
- Santa Rosa
- On San Francisco permits
- Aug 2011 to Sep 2022
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 2 days from filing to permit and 285 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2011 | Completed final sign-off Jun 2012 | 3814 Cesar Chavez St | 1. to comply w/nov #201190350 dated 1/28/11. 2. back stair repair, repair & replace steps and rises approx 8 steps. re-attach handrails - less than 50% repair/replacement. 3. remove vertical wood ladder to roof. (not required by code).Details
1. to comply w/nov #201190350 dated 1/28/11. 2. back stair repair, repair & replace steps and rises approx 8 steps. re-attach handrails - less than 50% repair/replacement. 3. remove vertical wood ladder to roof. (not required by code). | $650 |