Back to kitchen remodel contractors
Ever Grande Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2015 to Mar 2026
- Last 24 months
- 2 permits filed
36 permits since 2000: 28 completed, 3 in progress, 5 never finaled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 34 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2021 | Completed final sign-off Sep 2021 | 462 Head St | 2/f: remodel (e) kitchen, rmeove dbedroom an drestore it back to living room and convert (e) living room to bedroom. replace (e0 front windows and restore decorative irion railing.Details
2/f: remodel (e) kitchen, rmeove dbedroom an drestore it back to living room and convert (e) living room to bedroom. replace (e0 front windows and restore decorative irion railing. | $27,000 |
| Mar 23, 2021 | Completed final sign-off Dec 2021 | 1662 42nd Av | kitchen remodel at 2nd fl. remove (e) non-structural wall between kitchen & living area.Details
kitchen remodel at 2nd fl. remove (e) non-structural wall between kitchen & living area. | $10,000 |
| Oct 20, 2017 | Completed final sign-off Aug 2018 | 550 Shotwell St | project consists of demo and interior renovation of an extg free standing s.f.d. demo will include walls, moldings, floors, dists + framing, bath & kitchen fixtures, doors, renovate to include nw framing, gwb, fixtures, interior doors & frames. exterior work to be paint.Details
project consists of demo and interior renovation of an extg free standing s.f.d. demo will include walls, moldings, floors, dists + framing, bath & kitchen fixtures, doors, renovate to include nw framing, gwb, fixtures, interior doors & frames. exterior work to be paint. | $75,952 |
| Dec 16, 2016 | Completed final sign-off Apr 2019 | 627 12th Av | relocate e kitchen. convert e kitchen space to study rm and convert e bath to 2 full bath. all work at 2nd flDetails
relocate e kitchen. convert e kitchen space to study rm and convert e bath to 2 full bath. all work at 2nd fl | $32,000 |