Back to kitchen remodel contractors
Evan Palmer
- Based in
- Mill Valley
- On San Francisco permits
- May 2016 to May 2024
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 30 days from filing to permit and 410 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2022 | Completed final sign-off Nov 2023 | 290 Divisadero St | units 290-a, 290-b, 290-c: kitchen, bath remodel & window replacement. reconfigure 2nd & 3rd fl to 3 dwelling units to match unit count in 3-r report & assessor card. add a exterior stair.Details
units 290-a, 290-b, 290-c: kitchen, bath remodel & window replacement. reconfigure 2nd & 3rd fl to 3 dwelling units to match unit count in 3-r report & assessor card. add a exterior stair. | $500,000 |
| Mar 19, 2018 | Completed final sign-off Nov 2018 | 2479 Diamond St | 1st flr - kitchen and bath and bedroom remodel. 2nd flr - master bath remodel. replace windowsDetails
1st flr - kitchen and bath and bedroom remodel. 2nd flr - master bath remodel. replace windows | $70,000 |
| Feb 2, 2018 | Completed final sign-off Nov 2018 | 2479 Diamond St | 1. replace kitchen cabinets, appliances; upgrade bath vanity,tub, shower.; reconfigure door swing.Details
1. replace kitchen cabinets, appliances; upgrade bath vanity,tub, shower.; reconfigure door swing. | $50,000 |
| May 27, 2016 | Completed final sign-off Jan 2022 | 4971 17th St | legalization of 2nd floor unit per ordinance# 43-14. legalize kitchen, upgrade lighting & switches, provide hydronic heating. provide separate meters for gas, electrical and water.Details
legalization of 2nd floor unit per ordinance# 43-14. legalize kitchen, upgrade lighting & switches, provide hydronic heating. provide separate meters for gas, electrical and water. | $70,000 |