Euro Mind Design Corp
- Based in
- Mill Valley
- On San Francisco permits
- Dec 2012 to Jul 2016
- Last 24 months
- 0 permits filed
27 permits since 2000: 18 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 never finaled. Typically 4 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2016 | Completed final sign-off Dec 2017 | 938 Hampshire St | revision to 201507141395, remove walls in kitchens,bedrooms,baths, on both floors, add structural beams, reconfigure 2 baths, reconfigure 2 kitchens, relocate water heaters, add half bath. repair rear walls as required.Details
revision to 201507141395, remove walls in kitchens,bedrooms,baths, on both floors, add structural beams, reconfigure 2 baths, reconfigure 2 kitchens, relocate water heaters, add half bath. repair rear walls as required. | $70,000 |
| Mar 20, 2015 | Never finaled issued Mar 2015, no final | 2424 Mariposa St | revision to (e) pa#201412184013- kitchen remodel with new equipment, electrical & plumbing. n/a ordinance #155-13. move front door. add exit signs.Details
revision to (e) pa#201412184013- kitchen remodel with new equipment, electrical & plumbing. n/a ordinance #155-13. move front door. add exit signs. | $72,000 |
| Mar 9, 2015 | Completed final sign-off May 2016 | 442 Munich St | remove undocumented kitchens at basement level and ground floor level per plan. to terminate both plumbing & electrical, seperate plumbing & electrical permits are required.Details
remove undocumented kitchens at basement level and ground floor level per plan. to terminate both plumbing & electrical, seperate plumbing & electrical permits are required. | $1,250 |
| Dec 24, 2013 | Never finaled issued Dec 2013, no final | 601 Van Ness Av | kitchen remodelDetails
kitchen remodel | $25,000 |
| Mar 15, 2013 | Completed final sign-off Apr 2013 | 3335 Clement St | build dividing wall in attaic between unit 3341 and 3337. place ladder access to unit 3337 below. kitchen remodel in unit 3339. upgrade main electrical panle for all 4 units. 3335-3341. place 4 new outlet total in 3337 clement st.Details
build dividing wall in attaic between unit 3341 and 3337. place ladder access to unit 3337 below. kitchen remodel in unit 3339. upgrade main electrical panle for all 4 units. 3335-3341. place 4 new outlet total in 3337 clement st. | $11,940 |
| Jan 4, 2013 | Completed final sign-off Apr 2013 | 3341 Clement St | replace cabinets & countertop in kitchen only, install dedicated dishwasher circuit 20a, no floors, doors ,windows or ceilings on this permit.Details
replace cabinets & countertop in kitchen only, install dedicated dishwasher circuit 20a, no floors, doors ,windows or ceilings on this permit. | $1,500 |