Back to kitchen remodel contractors
Essex General Contractors Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Oct 2020
- Last 24 months
- 0 permits filed
78 permits since 2000: 73 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
27 kitchen remodel permits: 25 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 209 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2020 | Expired or cancelled cancelled Apr 2023 | 1330 Clement St | add a new adu as per state adu progr in unconditioned space at the first floor to include a new bedroom, bath, living/dining and kitchen; infill space at the rear under existing 2nd floor level and within the ground level of the side lightwell. first floor to be fully sprinklered as per 2019 nfpa 13Details
add a new adu as per state adu progr in unconditioned space at the first floor to include a new bedroom, bath, living/dining and kitchen; infill space at the rear under existing 2nd floor level and within the ground level of the side lightwell. first floor to be fully sprinklered as per 2019 nfpa 13 | $70,000 |
| May 8, 2019 | Completed final sign-off Nov 2019 | 2351 17th Av | kitchen remodel in kind. new cabinets, fixtures, flooring, appliances, lighting. 15'x10'Details
kitchen remodel in kind. new cabinets, fixtures, flooring, appliances, lighting. 15'x10' | $50,000 |
| Dec 15, 2017 | Completed final sign-off Jul 2018 | 4390 26th St | work in addition to pa 2017-0918-8806 (kitchen reno). interior reconfiguration @ 3rd fl for open wall between kitchen & family room, renovate bath; 1st fl - bath renowation; enlarged doors to rear roofdecks & removal of door @ 1st floor rear bedroomDetails
work in addition to pa 2017-0918-8806 (kitchen reno). interior reconfiguration @ 3rd fl for open wall between kitchen & family room, renovate bath; 1st fl - bath renowation; enlarged doors to rear roofdecks & removal of door @ 1st floor rear bedroom | $45,000 |
| Sep 18, 2017 | Completed final sign-off Jul 2018 | 4390 26th St | kitchen remodel, new cabinets, countertops, tile, fixtures, lighting. also check windows for leaks and dry rot.Details
kitchen remodel, new cabinets, countertops, tile, fixtures, lighting. also check windows for leaks and dry rot. | $25,000 |
| Jul 7, 2017 | Completed final sign-off Dec 2017 | 131 Molimo Dr | kitchen remodel, cabinets, countertop, tile floor, lighting, appliances no walls moved/removed/added/infilled, all (e) layouts to remain unchanged.Details
kitchen remodel, cabinets, countertop, tile floor, lighting, appliances no walls moved/removed/added/infilled, all (e) layouts to remain unchanged. | $25,000 |
| Jun 9, 2016 | Completed final sign-off Jan 2017 | 665 Alvarado St | demolition of interior walls, minor structural work @second floor,re-configuration of walls @ second floor,(n) appliances & fixtures/kitchen & bath remodel.Details
demolition of interior walls, minor structural work @second floor,re-configuration of walls @ second floor,(n) appliances & fixtures/kitchen & bath remodel. | $30,000 |
| Jan 21, 2016 | Completed final sign-off May 2016 | 2463 Jackson St | re-face kitchen, new cabinets, tile, lighting, countertops. no change to layout.Details
re-face kitchen, new cabinets, tile, lighting, countertops. no change to layout. | $25,000 |
| Sep 14, 2015 | Completed final sign-off Apr 2016 | 167 Carl St | revision to pa 2015 0708 0936, remodel kitchen, master bath, guest bath, 3rd bath & powder rooms. new tile, cabinets, fixtures, elect, plumb. modify kitchen dining wall. dry rot repairs, stucco interior wall remove less than 75%.no change to front exterior visible from the street.Details
revision to pa 2015 0708 0936, remodel kitchen, master bath, guest bath, 3rd bath & powder rooms. new tile, cabinets, fixtures, elect, plumb. modify kitchen dining wall. dry rot repairs, stucco interior wall remove less than 75%.no change to front exterior visible from the street. | $200,000 |
| Aug 17, 2015 | Completed final sign-off May 2016 | 2463 Jackson St | remove existing partition wall between kitchen and dining room at unit 2463 on 1st fl. add new pantry and closet at hallway. n/a maher ord. #155-13Details
remove existing partition wall between kitchen and dining room at unit 2463 on 1st fl. add new pantry and closet at hallway. n/a maher ord. #155-13 | $5,000 |
| Jul 8, 2015 | Completed final sign-off Apr 2016 | 167 Carl St | one kitchen remodel, replace cabinets, fixtures, tile, lighting, in kindDetails
one kitchen remodel, replace cabinets, fixtures, tile, lighting, in kind | $28,000 |
| Jun 17, 2015 | Never finaled issued Jun 2015, no final | 22 Roselyn Tr | replace kitchen cabinets, appliances, lighting & plubing fixtures, new tile floor & backsplash. to comply with cec150.0(k)3Details
replace kitchen cabinets, appliances, lighting & plubing fixtures, new tile floor & backsplash. to comply with cec150.0(k)3 | $20,000 |
| Jan 7, 2015 | Completed final sign-off Jun 2015 | 868 Minnesota St | partial kitchen re-face, new tile, cabinets, relocate refrig, new lighting & counter tops. no alteration of wall, window and door.Details
partial kitchen re-face, new tile, cabinets, relocate refrig, new lighting & counter tops. no alteration of wall, window and door. | $7,500 |
| Sep 18, 2013 | Completed final sign-off Jun 2014 | 319 Laidley St | to remodel the extg kitchen. to relocate an extg shear wall. to replace the extg furnace. to repair/replace a dryrot roof deck.Details
to remodel the extg kitchen. to relocate an extg shear wall. to replace the extg furnace. to repair/replace a dryrot roof deck. | $90,000 |
| Jul 9, 2013 | Completed final sign-off Mar 2014 | 1179 Filbert St | remodel kitchen and 2 bathrooms. no change to walls.light shall comply with cfc150 k. exhuast connect to extg duct.Details
remodel kitchen and 2 bathrooms. no change to walls.light shall comply with cfc150 k. exhuast connect to extg duct. | $30,000 |
| Jun 7, 2013 | Completed final sign-off May 2014 | 2150 Vallejo St | unit 2 - kitchen & 2 bathrooms remodel; no change to layout, new cabintes, tiles, lightings cec150(k), plumbing fixtures.Details
unit 2 - kitchen & 2 bathrooms remodel; no change to layout, new cabintes, tiles, lightings cec150(k), plumbing fixtures. | $35,000 |
| Jun 7, 2013 | Completed final sign-off Jun 2014 | 2150 Vallejo St | unit 3 - revision to pa 201304265603, kitchen & bath remodel, add laundry in closet. delete bathroom window, add 2 skylights.Details
unit 3 - revision to pa 201304265603, kitchen & bath remodel, add laundry in closet. delete bathroom window, add 2 skylights. | $35,000 |
| Apr 26, 2013 | Completed final sign-off Jun 2014 | 2150 Vallejo St | kitchen and bath remodel - new tile, appliances fixtures. min 50% total wattage kitchen lights high efficacy - bath lights high efficacyDetails
kitchen and bath remodel - new tile, appliances fixtures. min 50% total wattage kitchen lights high efficacy - bath lights high efficacy | $25,000 |
| Jan 7, 2013 | Completed final sign-off Aug 2013 | 2151 Sacramento St | re-face one kitchen and 2 baths, new cabinets, tile, plumbing fixtures & electrical, no change on wallsDetails
re-face one kitchen and 2 baths, new cabinets, tile, plumbing fixtures & electrical, no change on walls | $25,000 |
| Nov 23, 2011 | Completed final sign-off Mar 2012 | 2743 Gough St | replace kitchen cabinets, plumbing fixtures, counter tops, lighting, tile lighting comply with cec 150(k), no change to exhaust systemDetails
replace kitchen cabinets, plumbing fixtures, counter tops, lighting, tile lighting comply with cec 150(k), no change to exhaust system | $25,000 |
| Oct 31, 2011 | Completed final sign-off Apr 2012 | 2815 Franklin St | remove 2nd interior stairs, remodel 2 bathrooms, kitchen, new lighting in living room, 2 in front, relocate skylightDetails
remove 2nd interior stairs, remodel 2 bathrooms, kitchen, new lighting in living room, 2 in front, relocate skylight | $75,000 |
| Sep 9, 2010 | Completed final sign-off Jan 2011 | 152 10th Av | renovate master & guest bathrooms, add closet to master bedroom, replace kitchen countertop & add peninsula cabinets. renovate fireplace surround & add gas logDetails
renovate master & guest bathrooms, add closet to master bedroom, replace kitchen countertop & add peninsula cabinets. renovate fireplace surround & add gas log | $25,000 |
| Mar 8, 2010 | Completed final sign-off May 2010 | 315 Noriega St | unit 315 b noreiga, top floor. kitchen remodel, new cabinets, counter tops, lighting, widen doorway, new windows at rear not visible from streetDetails
unit 315 b noreiga, top floor. kitchen remodel, new cabinets, counter tops, lighting, widen doorway, new windows at rear not visible from street | $20,000 |
| Sep 28, 2009 | Completed final sign-off Jan 2010 | 1175 Filbert St | remodel kitchen & laundry only; 1 new header beam.Details
remodel kitchen & laundry only; 1 new header beam. | $20,000 |
| Sep 3, 2009 | Completed final sign-off Feb 2010 | 887 Cayuga Av | renovation of kitchen with new cabinetry, electrical & plumbing. replacement of interior stairs, new skylight & new rear exterior doors. no additional square footage addedDetails
renovation of kitchen with new cabinetry, electrical & plumbing. replacement of interior stairs, new skylight & new rear exterior doors. no additional square footage added | $85,000 |
| Feb 14, 2007 | Completed final sign-off Nov 2007 | 1080 Chestnut St | new kitchen, cabinets, countertops, appliances, plumbing fixture lighting (2) new bathrooms new tile, fixtures, lighting new doors, no structural work new electrical: flourescent lighting.Details
new kitchen, cabinets, countertops, appliances, plumbing fixture lighting (2) new bathrooms new tile, fixtures, lighting new doors, no structural work new electrical: flourescent lighting. | $75,000 |
| Apr 7, 2005 | Completed final sign-off Nov 2005 | 333 Bush St | kitchen and 2 bath remodel, relocate kitchen, change door openings, relocate electric panelDetails
kitchen and 2 bath remodel, relocate kitchen, change door openings, relocate electric panel | $20,000 |
| Mar 1, 2005 | Completed final sign-off Nov 2005 | 333 Bush St | kitchen cabs appliances, countertops, replaced bathrms, (2) new vanities, tile, plumbing fixtures, nDetails
kitchen cabs appliances, countertops, replaced bathrms, (2) new vanities, tile, plumbing fixtures, n | $100,000 |