Back to kitchen remodel contractors
Endora Builders
- Based in
- San Francisco
- On San Francisco permits
- Feb 2021 to Jul 2026
- Last 24 months
- 10 permits filed
26 permits since 2000: 19 completed, 5 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 5 completed, 4 in progress, 1 never finaled. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Aug 2026 | 1519 31st Av | interior renovation of kitchen, bathroom & powder room, relocation of (e) exterior window at exterior courtyard, no change to front facade, new skylight and in-kind (e) skylight replacementDetails
interior renovation of kitchen, bathroom & powder room, relocation of (e) exterior window at exterior courtyard, no change to front facade, new skylight and in-kind (e) skylight replacement | $30,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 200 Darien Wy | kitchen remodel without layout changes (mep). replace (2) windows in-kind. remove partition wall in the kitchen.Details
kitchen remodel without layout changes (mep). replace (2) windows in-kind. remove partition wall in the kitchen. | $35,000 |
| Dec 28, 2025 | In progress issued Jul 2026 | 2140 Lake St | convert 848 sf to adu: 1bed/1bth, replace windows in-kind,enlarge bedroom windows, (e) kitchen remodel, remodel (e) bath, add 2nd bath & laundry. add subpanel, plumbing,hvac. 202510227916 under sep permit for work on levels 2 & 3.Details
convert 848 sf to adu: 1bed/1bth, replace windows in-kind,enlarge bedroom windows, (e) kitchen remodel, remodel (e) bath, add 2nd bath & laundry. add subpanel, plumbing,hvac. 202510227916 under sep permit for work on levels 2 & 3. | $250,000 |
| Oct 22, 2025 | In progress issued Oct 2025 | 2140 Lake St | 2nd level: kitchen remodel with light electric, 3rd level: 2 baths remodel, and add closets to bedrooms 1 and 2Details
2nd level: kitchen remodel with light electric, 3rd level: 2 baths remodel, and add closets to bedrooms 1 and 2 | $100,000 |
| Jul 29, 2024 | Completed final sign-off Jan 2025 | 1231 48th Av | kitchen remodel. remove non load bearing wall between kitchen & living room for open concept layout. (n) skylightDetails
kitchen remodel. remove non load bearing wall between kitchen & living room for open concept layout. (n) skylight | $60,000 |
| Jul 12, 2023 | Completed final sign-off Mar 2024 | 477 Frederick St | one kitchen remodel: replace in kind: one bathroom remodel (replace in kind). kitchen: replace cabinets, counter top, sink. bathroom: replace vanity, tub, toilet, and tiles.Details
one kitchen remodel: replace in kind: one bathroom remodel (replace in kind). kitchen: replace cabinets, counter top, sink. bathroom: replace vanity, tub, toilet, and tiles. | $45,000 |
| May 25, 2023 | Completed final sign-off Aug 2024 | 1008 Castro St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $60,000 |
| Jan 17, 2023 | Never finaled issued Jan 2023, no final | 1262 48th Av | unit #a: kitchen remodeling, no layout changes. electrical and plumbing work to follow building code.Details
unit #a: kitchen remodeling, no layout changes. electrical and plumbing work to follow building code. | $25,000 |
| Sep 15, 2022 | Completed final sign-off Jan 2023 | 2695 46th Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $30,000 |
| Jun 27, 2022 | Completed final sign-off Dec 2022 | 511 El Camino Del Mar | kitchen remodel. no layout change.Details
kitchen remodel. no layout change. | $32,000 |