Back to kitchen remodel contractors
Emmery Construciton & Renovation
- Based in
- El Granada
- On San Francisco permits
- Nov 2017 to Dec 2019
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 4 completed, 3 never finaled. Typically 0 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 170 Northwood Dr | kitchen remodel including removal of non load bearing walls and place beam under roofDetails
kitchen remodel including removal of non load bearing walls and place beam under roof | $20,000 |
| Oct 17, 2019 | Completed final sign-off Nov 2020 | 701 Minnesota St | kitchen remodel no change to plumbing, bathroom remodel. new led lights kitchen.Details
kitchen remodel no change to plumbing, bathroom remodel. new led lights kitchen. | $20,000 |
| Jul 18, 2019 | Completed final sign-off May 2020 | 2670 San Jose Av | kitchen renovation: new cabinets applinaces (kitchne 60sq feet) bathroom: retile (bathroom 30sq feet) no structural work. no walls to be moved.Details
kitchen renovation: new cabinets applinaces (kitchne 60sq feet) bathroom: retile (bathroom 30sq feet) no structural work. no walls to be moved. | $25,000 |
| May 14, 2019 | Completed final sign-off Oct 2019 | 576 Dewey Bl | renew kitchen cabinets. no change to location of plumbing or electrical. kitchen remodel.Details
renew kitchen cabinets. no change to location of plumbing or electrical. kitchen remodel. | $15,000 |
| Jan 14, 2019 | Completed final sign-off Jul 2019 | 1316 Portola Dr | remodel (e) kitchen, replace counter, counter top & cabinets. remove partial partition wall & install one 4x12 psl beam at kitchen wall @ 2nd floor; remodel/enlarge (e) bathroom, install (n) shower stall & relocate toilet at ground floorDetails
remodel (e) kitchen, replace counter, counter top & cabinets. remove partial partition wall & install one 4x12 psl beam at kitchen wall @ 2nd floor; remodel/enlarge (e) bathroom, install (n) shower stall & relocate toilet at ground floor | $22,000 |
| Jan 2, 2018 | Never finaled issued Jan 2018, no final | 1706 Dolores St | demo old kitchen cabinets & replace with new no chnage to location of any services, kitchen remodelDetails
demo old kitchen cabinets & replace with new no chnage to location of any services, kitchen remodel | $20,000 |
| Nov 17, 2017 | Never finaled issued Nov 2017, no final | 1600 Greenwich St | new electrical service 200 amp from street new kitchen remodel (no change in locaiton or services)no walls, moved, removed added or infilled. all (e) layouts to remain unchangedDetails
new electrical service 200 amp from street new kitchen remodel (no change in locaiton or services)no walls, moved, removed added or infilled. all (e) layouts to remain unchanged | $32,000 |