Elux Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2011 to Jan 2026
- Last 24 months
- 4 permits filed
23 permits since 2000: 18 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 in progress. Typically 305 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2024 | In progress issued Jul 2025 | 1279 34th Av | interior remodel of bath, kithcen & stairs. update plumbing, electrical, new skylights. infill patia @ 2nd fl, enclose lightwell @ 2nd fl south side of bldg. new powder room @ 2nd flDetails
interior remodel of bath, kithcen & stairs. update plumbing, electrical, new skylights. infill patia @ 2nd fl, enclose lightwell @ 2nd fl south side of bldg. new powder room @ 2nd fl | $275,000 |
| Sep 8, 2023 | Completed final sign-off Mar 2024 | 494 Flood Av | 2/f: remodeling (e) kitchen, bathrm, add toilet rm and interior stairs to 1/f; remove non-bearing wall; 1/f: add family rm, bedrm, bathrm and repair damaged foundation. (490 sf)Details
2/f: remodeling (e) kitchen, bathrm, add toilet rm and interior stairs to 1/f; remove non-bearing wall; 1/f: add family rm, bedrm, bathrm and repair damaged foundation. (490 sf) | $112,000 |
| Sep 29, 2022 | Completed final sign-off Apr 2024 | 1459 South Van Ness Av | request for an emergency demo permit for front entry stairs/landing/alternate home entry @ rear exists on virgil street. will come back after demo w/drawings for subsequent permit for new front entry. emailed the structural engineer assessment to dbi mauricio hernandezDetails
request for an emergency demo permit for front entry stairs/landing/alternate home entry @ rear exists on virgil street. will come back after demo w/drawings for subsequent permit for new front entry. emailed the structural engineer assessment to dbi mauricio hernandez | $10,000 |
| Aug 1, 2022 | Completed final sign-off Mar 2025 | 1851 35th Av | 1/f: horizontal addition @ rear building w/ family room, wet bar. relocated (e) bathroom, converted (e) family room to bedroom. 2/f: horizontal addition @ rear building w/ (n) bedroom, & bathroom. remodeled (e) kitchen. relocated (e) interior stairs to 1/f.Details
1/f: horizontal addition @ rear building w/ family room, wet bar. relocated (e) bathroom, converted (e) family room to bedroom. 2/f: horizontal addition @ rear building w/ (n) bedroom, & bathroom. remodeled (e) kitchen. relocated (e) interior stairs to 1/f. | $250,000 |