Elite Builder And Design
- Based in
- Modesto
- On San Francisco permits
- Aug 2023 to Jun 2026
- Last 24 months
- 4 permits filed
6 permits since 2000: 3 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 1 completed, 1 expired or cancelled. Typically 142 days from filing to permit and 798 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2025 | Expired or cancelled expired Jul 2026 | 686 Connecticut St | revision to pa# 202308043774 s-1: mep work to design/build. remove/replace non structural interior partitions, (n) 1/2 bath to be replace full bath. revise guardrail (ext) design. extend roof parapet 3'-8" in length. repair (e) terrazzo steps. enlarge roof deck area per updated set backs.Details
revision to pa# 202308043774 s-1: mep work to design/build. remove/replace non structural interior partitions, (n) 1/2 bath to be replace full bath. revise guardrail (ext) design. extend roof parapet 3'-8" in length. repair (e) terrazzo steps. enlarge roof deck area per updated set backs. | $5,000 |
| Aug 4, 2023 | Completed final sign-off Jul 2026 | 686 Connecticut St | 3rd floor addition to and partial interior renvoation of (e) two-story house.new roof decks at roof and front setback. replcment of (e) windows and installation of (n) windows; doors. interior includes 2 new full bathrooms. (n) 1st floor addition under (e) rear overhang. replace (e) rear yard deck.Details
3rd floor addition to and partial interior renvoation of (e) two-story house.new roof decks at roof and front setback. replcment of (e) windows and installation of (n) windows; doors. interior includes 2 new full bathrooms. (n) 1st floor addition under (e) rear overhang. replace (e) rear yard deck. | $550,000 |