Back to kitchen remodel contractors
Eisen Construction
- Based in
- Daly City
- On San Francisco permits
- Mar 2000 to May 2002
- Last 24 months
- 0 permits filed
18 permits since 2000: 13 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2001 | Completed final sign-off Mar 2002 | 3806 18th St | fire damage repairs to roof, kitchen walls and interior finishes repairs to be like kind and qualityDetails
fire damage repairs to roof, kitchen walls and interior finishes repairs to be like kind and quality | $45,000 |
| Jun 1, 2000 | Never finaled filed Jun 2000, never issued | 670 21st Av | fire damage repairs to lower level drywall floor covering bathrm and kitchen cabinets and fixturesDetails
fire damage repairs to lower level drywall floor covering bathrm and kitchen cabinets and fixtures | $45,000 |