Back to kitchen remodel contractors
Edward Reilly Construction
- Based in
- Pacifica
- On San Francisco permits
- Apr 2000 to Jan 2014
- Last 24 months
- 0 permits filed
18 permits since 2000: 12 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2006 | Expired or cancelled expired Sep 2007 | 151 Central Av | repair fire damage to all dwelling units. sheet rock damaged walls, install wiring where necessary, replace kitchen cabinets. root replacement & framing under separate permit. no drawings required per district inspector review.Details
repair fire damage to all dwelling units. sheet rock damaged walls, install wiring where necessary, replace kitchen cabinets. root replacement & framing under separate permit. no drawings required per district inspector review. | $300,000 |
| May 26, 2004 | Expired or cancelled expired Dec 2006 | 165 Fair Oaks St | replace sheetrock & patch walls & ceiling install cabs & countertop, install sink in the kitchen, inDetails
replace sheetrock & patch walls & ceiling install cabs & countertop, install sink in the kitchen, in | $8,000 |