Edl Construction Corp
- Based in
- Hayward
- On San Francisco permits
- Oct 2002 to Jul 2026
- Last 24 months
- 5 permits filed
39 permits since 2000: 36 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 52 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2010 | Completed final sign-off Dec 2010 | 419 Joost Av | remove existing deck and stairs in rear. construct new deck and stairs with 2 levels in rear. replace existing slab and retaining wall with new concrete retaining wallDetails
remove existing deck and stairs in rear. construct new deck and stairs with 2 levels in rear. replace existing slab and retaining wall with new concrete retaining wall | $32,879 |
| Apr 4, 2007 | Completed final sign-off May 2007 | 819 Ocean Av | existing deck at back of house. due to dryrot, replace in kind. replace existing deck means of 2nd egress, less 50% requiredDetails
existing deck at back of house. due to dryrot, replace in kind. replace existing deck means of 2nd egress, less 50% required | $9,000 |