Back to bathroom remodel contractors
Edl Construction Corp
- Based in
- Hayward
- On San Francisco permits
- Oct 2002 to Jul 2026
- Last 24 months
- 5 permits filed
39 permits since 2000: 36 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 in progress. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2026 | In progress issued Jul 2026 | 652 Duncan St | remodel primary bathroom like for like, all new tiles fixtures etc. remove stucco on wall facing street due to a leak over roofing drain-spout.Details
remodel primary bathroom like for like, all new tiles fixtures etc. remove stucco on wall facing street due to a leak over roofing drain-spout. | $40,000 |
| May 29, 2025 | Completed final sign-off Sep 2025 | 671 Duncan St | remodel of (e) 53 sq ft bathroom. scope includes demolition of existing finishes, relocation of toilet and sink, installation of new bathtub, shower valve, and lighting. work involves new plumbing and electrical. rough ins, moisture resistant drywall, cement boards at wet areasDetails
remodel of (e) 53 sq ft bathroom. scope includes demolition of existing finishes, relocation of toilet and sink, installation of new bathtub, shower valve, and lighting. work involves new plumbing and electrical. rough ins, moisture resistant drywall, cement boards at wet areas | $34,000 |
| Nov 6, 2024 | Completed final sign-off Sep 2025 | 670 Duncan St | remodel (2) bathrooms, master and guest bathroom like for like - includes new toilet, 1.25 gpm, (3) light fixtures, led, new shower valve etc. remodel kitchen like for like - new appliances. new cabinetry, new counter top/back splash.Details
remodel (2) bathrooms, master and guest bathroom like for like - includes new toilet, 1.25 gpm, (3) light fixtures, led, new shower valve etc. remodel kitchen like for like - new appliances. new cabinetry, new counter top/back splash. | $95,000 |
| Jul 14, 2016 | Completed final sign-off Jan 2017 | 408 Franconia St | remodel (2) full bathroom and 1-1/2 baths; install 3/fans, remove/replace siding on the back of a houseDetails
remodel (2) full bathroom and 1-1/2 baths; install 3/fans, remove/replace siding on the back of a house | $60,000 |
| May 19, 2010 | Completed final sign-off Oct 2010 | 140 Paloma Av | remodel (e) bathroom, install new toilet, vanity, shower head, upgrade electrical to gfci, install 2 new dedicated circuits. upgrade plumbing. install new fan for bathroomDetails
remodel (e) bathroom, install new toilet, vanity, shower head, upgrade electrical to gfci, install 2 new dedicated circuits. upgrade plumbing. install new fan for bathroom | $13,000 |
| Jan 6, 2009 | Completed final sign-off Apr 2009 | 1883 Church St | upgrade electrical in whole interior. install new 220-amps panel. removal of wall only for electricy. install new furnace, new cabinets, new appliance for 1 kitchen. 1 bath tub, shower, head, repair 6 x 16 siding that has dry rot @ side of house. in kind. install insulation & 1/2" sheetrock onDetails
upgrade electrical in whole interior. install new 220-amps panel. removal of wall only for electricy. install new furnace, new cabinets, new appliance for 1 kitchen. 1 bath tub, shower, head, repair 6 x 16 siding that has dry rot @ side of house. in kind. install insulation & 1/2" sheetrock on | $40,000 |
| Jan 27, 2006 | Completed final sign-off Mar 2006 | 2266 48th Av | install 1/2 bath on proposed area show on plans. 2nd floor.Details
install 1/2 bath on proposed area show on plans. 2nd floor. | $4,500 |
| Jan 21, 2005 | Completed final sign-off Mar 2005 | 744 24th Av | install washer/dryer,install 220-110 electrical plumbing for washer & vents in (e) bathroom,Details
install washer/dryer,install 220-110 electrical plumbing for washer & vents in (e) bathroom, | $2,800 |
| Oct 22, 2002 | Completed final sign-off Dec 2002 | 819 Ocean Av | bathroom remodel,tile replacement,small amount of sheetrock,bathtub toilet & repair some dry (if anyDetails
bathroom remodel,tile replacement,small amount of sheetrock,bathtub toilet & repair some dry (if any | $6,000 |