Edenavow Construction & Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Aug 2026
- Last 24 months
- 14 permits filed
161 permits since 2000: 115 completed, 7 in progress, 29 never finaled, 10 expired or cancelled.
Of the 29 never-finaled permits, 5 are 3 to 5 years old, 18 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
17 deck permits: 13 completed, 2 in progress, 2 never finaled. Typically 5 days from filing to permit and 49 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2025 | In progress issued Dec 2025 | 4331 23rd St | enclosing lower lvel deck into livable space, small associated layout change. new lower level deck. reframe and raise st fl sunroom fl and ceiling to align w floor/ceiling throughout 1st fl.remodel kitchen. 2nd fl bath remodel, new deck2nd fl top of sunroom.new lower lvl deckDetails
enclosing lower lvel deck into livable space, small associated layout change. new lower level deck. reframe and raise st fl sunroom fl and ceiling to align w floor/ceiling throughout 1st fl.remodel kitchen. 2nd fl bath remodel, new deck2nd fl top of sunroom.new lower lvl deck | $500,000 |
| Dec 17, 2025 | In progress issued Feb 2026 | 1969 10th Av | interior remodel within e building envelope. new livable space 1st fl level space 1st level, new storage loft over garage. new stair btwn floors. new elec plumb as req at area of remodel. replace windows in kind w new dbl glazed. 1 new fire rated window. new deck at grade, 4 new skylightsDetails
interior remodel within e building envelope. new livable space 1st fl level space 1st level, new storage loft over garage. new stair btwn floors. new elec plumb as req at area of remodel. replace windows in kind w new dbl glazed. 1 new fire rated window. new deck at grade, 4 new skylights | $350,000 |
| Sep 2, 2022 | Completed final sign-off Dec 2023 | 1231 44th Av | remodel exsting rear stairs with code complaint stairs & deck. new 1-hr fire rated wall along property line.Details
remodel exsting rear stairs with code complaint stairs & deck. new 1-hr fire rated wall along property line. | $150,000 |
| Aug 3, 2022 | Completed final sign-off Jan 2024 | 3982 Cesar Chavez St | interior remodel including kitchen and bathroom on 1/f. new electrical and plumbing at rea of new work. new exterior door & windows at area of new work (not street facing). deck addition to rear yard. replacement of rotten siding at area of new work.Details
interior remodel including kitchen and bathroom on 1/f. new electrical and plumbing at rea of new work. new exterior door & windows at area of new work (not street facing). deck addition to rear yard. replacement of rotten siding at area of new work. | $100,000 |
| Feb 22, 2022 | Completed final sign-off Mar 2022 | 577 Sanchez St | replacing 200 sqft pressure treated 2 x 6 decking planks with 2 x 6 redwood planks. less than 50% of total deck. rear yard/not street facing.Details
replacing 200 sqft pressure treated 2 x 6 decking planks with 2 x 6 redwood planks. less than 50% of total deck. rear yard/not street facing. | $10,000 |
| Sep 10, 2021 | Completed final sign-off Oct 2021 | 145 Divisadero St | 400 sqft of decking replacement. replacing redwood to trex composite material. not visible from street / rear of property. repairs are 50% or less. lights per cenc 150.0 (k)Details
400 sqft of decking replacement. replacing redwood to trex composite material. not visible from street / rear of property. repairs are 50% or less. lights per cenc 150.0 (k) | $10,000 |
| Mar 31, 2021 | Completed final sign-off Sep 2022 | 1374 Alabama St | demolish (e) rear stair. construct new stairs & decks.Details
demolish (e) rear stair. construct new stairs & decks. | $19,000 |
| Aug 28, 2017 | Never finaled issued Aug 2017, no final | 178 Midcrest Wy | remove & replace dryrot in rear deck, joists & posts, 50% or less repair.Details
remove & replace dryrot in rear deck, joists & posts, 50% or less repair. | $10,000 |
| May 17, 2017 | Never finaled issued Aug 2018, no final | 12 Divisadero St | addition of a (n) rear deck to the lower unit of a 2 unit bldg on 2nd flr of bldg. deck is 3'-5 1/4 x 10'-6" does not intrude into minimum rear setback. not visible from street.Details
addition of a (n) rear deck to the lower unit of a 2 unit bldg on 2nd flr of bldg. deck is 3'-5 1/4 x 10'-6" does not intrude into minimum rear setback. not visible from street. | $9,750 |
| May 20, 2016 | Completed final sign-off Aug 2016 | 136 Acadia St | addition of a rear deck on top of an (e) roof at the 2nd floor.Details
addition of a rear deck on top of an (e) roof at the 2nd floor. | $11,700 |
| Oct 19, 2015 | Completed final sign-off Nov 2015 | 136 Acadia St | replace existing rear deckDetails
replace existing rear deck | $4,000 |
| Sep 18, 2015 | Completed final sign-off Oct 2015 | 1203 Kirkham St | replacement of (5) 2x8 joists in kind on deck at rear of bldg. less than 50% repair.Details
replacement of (5) 2x8 joists in kind on deck at rear of bldg. less than 50% repair. | $3,000 |
| Jul 3, 2014 | Completed final sign-off Oct 2014 | 735 47th Av | replace extg windows at rear. same size u=0.40 and dry rot repair in extg rear deck. deck less than 50%. no plan.Details
replace extg windows at rear. same size u=0.40 and dry rot repair in extg rear deck. deck less than 50%. no plan. | $6,500 |
| May 30, 2014 | Completed final sign-off Jun 2014 | 1117 Alabama St | dry rot repair on rear deck, stairs, replace rotted stringers & post, railings not to exceed 50%Details
dry rot repair on rear deck, stairs, replace rotted stringers & post, railings not to exceed 50% | $2,000 |
| May 21, 2014 | Completed final sign-off Jun 2014 | 1710 48th Av | dry rot repair for extg rear deck and stairs.Details
dry rot repair for extg rear deck and stairs. | $5,000 |
| May 12, 2011 | Completed final sign-off May 2011 | 340 Arlington St | dryrot repair of exterior deck & stairs. replacement of affected treads & stringers in kind. rremoval of tiled surface of deck to be replaced by trex.Details
dryrot repair of exterior deck & stairs. replacement of affected treads & stringers in kind. rremoval of tiled surface of deck to be replaced by trex. | $2,000 |
| Jul 24, 2008 | Completed final sign-off Jun 2010 | 425 London St | horizontal addition to rear of property, demolition 2 backrooms reconstruct and extend adding deck & two bedrooms.Details
horizontal addition to rear of property, demolition 2 backrooms reconstruct and extend adding deck & two bedrooms. | $42,000 |