Back to bathroom remodel contractors
Edenavow Construction & Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Aug 2026
- Last 24 months
- 14 permits filed
161 permits since 2000: 115 completed, 7 in progress, 29 never finaled, 10 expired or cancelled.
Of the 29 never-finaled permits, 5 are 3 to 5 years old, 18 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
54 bathroom remodel permits: 35 completed, 3 in progress, 11 never finaled, 5 expired or cancelled. Typically 5 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2026 | In progress issued Apr 2026 | 4332 19th St | bathroom remodel in-kind fixtures.Details
bathroom remodel in-kind fixtures. | $50,000 |
| Feb 3, 2026 | In progress issued Feb 2026 | 4331 23rd St | revision to bpa: 202512222388 - updated master bath layout, elimination of transom window above door at west elevation, change from sliding window to sliding door at south elevation and sistering of (e) brick foundation with new concrete footing at property line shear walls an on gl5Details
revision to bpa: 202512222388 - updated master bath layout, elimination of transom window above door at west elevation, change from sliding window to sliding door at south elevation and sistering of (e) brick foundation with new concrete footing at property line shear walls an on gl5 | $2,000 |
| Dec 22, 2025 | In progress issued Dec 2025 | 4331 23rd St | enclosing lower lvel deck into livable space, small associated layout change. new lower level deck. reframe and raise st fl sunroom fl and ceiling to align w floor/ceiling throughout 1st fl.remodel kitchen. 2nd fl bath remodel, new deck2nd fl top of sunroom.new lower lvl deckDetails
enclosing lower lvel deck into livable space, small associated layout change. new lower level deck. reframe and raise st fl sunroom fl and ceiling to align w floor/ceiling throughout 1st fl.remodel kitchen. 2nd fl bath remodel, new deck2nd fl top of sunroom.new lower lvl deck | $500,000 |
| Apr 7, 2025 | Completed final sign-off Jan 2026 | 261 Sweeny St | kitchen and bathroom remodel in kind. no wall removal.Details
kitchen and bathroom remodel in kind. no wall removal. | $70,000 |
| Apr 4, 2025 | Completed final sign-off Dec 2025 | 2541 Filbert St | 1st/fl: remodel bedroom and bathroom, 2nd/fl: replace 1 window in kitchen, and 3rd fl/: 3 windows in bedroomDetails
1st/fl: remodel bedroom and bathroom, 2nd/fl: replace 1 window in kitchen, and 3rd fl/: 3 windows in bedroom | $60,000 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 560 Clipper St | bathroom remodel non structuralDetails
bathroom remodel non structural | $40,000 |
| Jun 27, 2024 | Completed final sign-off Jan 2025 | 381 Lexington St | interior remodel (non structual) to kitchen and bathroom. addition of laundry closet. replace all non street facing door and windows in kind.Details
interior remodel (non structual) to kitchen and bathroom. addition of laundry closet. replace all non street facing door and windows in kind. | $60,000 |
| Jan 26, 2024 | Completed final sign-off Sep 2024 | 124 Saturn St | 552 sq ft remodel to basement level. add new bath, bedroom, and laundry room. demo attic bathroom and exterior walkway to unconditioned attic. no work to front facade. (partially comply with nov# 202294956 - attic portion)Details
552 sq ft remodel to basement level. add new bath, bedroom, and laundry room. demo attic bathroom and exterior walkway to unconditioned attic. no work to front facade. (partially comply with nov# 202294956 - attic portion) | $150,000 |
| Mar 30, 2023 | Completed final sign-off Jul 2023 | 1314 07th Av | 2nd fl: bathroom remodelDetails
2nd fl: bathroom remodel | $20,000 |
| Dec 13, 2022 | Completed final sign-off Sep 2024 | 1227 14th Av | 375sf single story horizontal addition on first floor, remodel (e) kitchen, add (n) bathroom, add 340sf conditioned basement below grade.Details
375sf single story horizontal addition on first floor, remodel (e) kitchen, add (n) bathroom, add 340sf conditioned basement below grade. | $135,000 |
| Aug 3, 2022 | Completed final sign-off Jan 2024 | 3982 Cesar Chavez St | interior remodel including kitchen and bathroom on 1/f. new electrical and plumbing at rea of new work. new exterior door & windows at area of new work (not street facing). deck addition to rear yard. replacement of rotten siding at area of new work.Details
interior remodel including kitchen and bathroom on 1/f. new electrical and plumbing at rea of new work. new exterior door & windows at area of new work (not street facing). deck addition to rear yard. replacement of rotten siding at area of new work. | $100,000 |
| Apr 4, 2022 | Completed final sign-off Oct 2022 | 577 Sanchez St | 1st floor- master bathroom remodel in kind. no removal of wallsDetails
1st floor- master bathroom remodel in kind. no removal of walls | $25,000 |
| Feb 18, 2022 | Completed final sign-off Oct 2022 | 577 Sanchez St | interior remodel of kitchen to 2/f. interior remodel of laundry room on 1/f to include additional of one bath. replacment of patio door not street facing. electrical and plumbing at areas of new work.Details
interior remodel of kitchen to 2/f. interior remodel of laundry room on 1/f to include additional of one bath. replacment of patio door not street facing. electrical and plumbing at areas of new work. | $120,000 |
| Feb 14, 2022 | Never finaled issued Mar 2022, no final | 10 Perego Tr | interior remodeling: 1st flr: in extg closet & hallway to build a new 34 sq ft. bathroom; extg master bathroom: remove extg tub & install nw standing shower; 2nd story: remove partition wall between kitchen & hallway per plan, per structural. remove & replace cabinets & fixtures. nw island, nw sinkDetails
interior remodeling: 1st flr: in extg closet & hallway to build a new 34 sq ft. bathroom; extg master bathroom: remove extg tub & install nw standing shower; 2nd story: remove partition wall between kitchen & hallway per plan, per structural. remove & replace cabinets & fixtures. nw island, nw sink | $150,000 |
| Oct 15, 2021 | Completed final sign-off Apr 2022 | 1638 14th Av | one kitchen and one bathroom remodel in kind. replacement of fixtures fittings and equipment in kind. non structural.Details
one kitchen and one bathroom remodel in kind. replacement of fixtures fittings and equipment in kind. non structural. | $45,000 |
| Sep 10, 2021 | Never finaled issued Sep 2021, no final | 445 Beacon St | master bathroom remodel (in kind). replacement of fixtures, fittings & tile. lights per cenc 150.0 (k)Details
master bathroom remodel (in kind). replacement of fixtures, fittings & tile. lights per cenc 150.0 (k) | $35,000 |
| Jun 15, 2021 | Completed final sign-off Sep 2021 | 311 Baden St | legalize work at ground fl. full bath and bedroomDetails
legalize work at ground fl. full bath and bedroom | |
| May 11, 2021 | Completed final sign-off Aug 2024 | 2244 19th St | horizontal & verticial addition single family house adding 3rd story. interior remodel & reocation of (e) kitchen & bathrooms. add 3rd bathroom, (n) stairway, (n) balconies & (n) stairs to the rear yardDetails
horizontal & verticial addition single family house adding 3rd story. interior remodel & reocation of (e) kitchen & bathrooms. add 3rd bathroom, (n) stairway, (n) balconies & (n) stairs to the rear yard | $390,000 |
| Apr 9, 2021 | Completed final sign-off May 2021 | 2683 17th Av | replacement skylight in bathroom(in-kind). u-max=0.30Details
replacement skylight in bathroom(in-kind). u-max=0.30 | $2,000 |
| Mar 5, 2021 | Completed final sign-off Dec 2021 | 1921 Jefferson St | 2 bathroom remodels: tiles nd fixtures in-kind.Details
2 bathroom remodels: tiles nd fixtures in-kind. | $40,000 |
| Mar 5, 2021 | Completed final sign-off Aug 2021 | 1482 11th Av | remodel ktichen & bathroom. replacement of fixtures in-kind.Details
remodel ktichen & bathroom. replacement of fixtures in-kind. | $65,000 |
| Mar 3, 2021 | Completed final sign-off Jul 2022 | 340 Urbano Dr | addition of insulation and gypsum wallboard to ceiling of (e) garage. replace (e) 2 furnaces. remodel (e) kitchen and (e) bathroom. relocate (e) bathroom. replace (e) aluminum windows at living room and kitchen with wood windows.Details
addition of insulation and gypsum wallboard to ceiling of (e) garage. replace (e) 2 furnaces. remodel (e) kitchen and (e) bathroom. relocate (e) bathroom. replace (e) aluminum windows at living room and kitchen with wood windows. | $95,000 |
| Feb 2, 2021 | Completed final sign-off May 2021 | 2683 17th Av | remodel of existing bathroom in kind.Details
remodel of existing bathroom in kind. | $20,000 |
| Sep 16, 2020 | Completed final sign-off Dec 2020 | 155 Beaver St | bathroom remodel in-kind. no structural workDetails
bathroom remodel in-kind. no structural work | $25,000 |
| Aug 13, 2020 | Completed final sign-off Jun 2021 | 256 Santa Clara Av | remodel of bathroom in kind. new tiles new fixtures.Details
remodel of bathroom in kind. new tiles new fixtures. | $14,000 |
| Aug 13, 2020 | Completed final sign-off Nov 2020 | 3982 Cesar Chavez St | remodel bathroom in kind, new tiles/ new fixtures remove drywall in front bedroom, insulate, install new dry wall. 5/8" type x drywall.Details
remodel bathroom in kind, new tiles/ new fixtures remove drywall in front bedroom, insulate, install new dry wall. 5/8" type x drywall. | $12,000 |
| Dec 11, 2019 | Completed final sign-off Jun 2020 | 15 Divisadero St | bathroom addition at level 2, removal of structural wall between kitchen and dining room, post to extend to garage levelDetails
bathroom addition at level 2, removal of structural wall between kitchen and dining room, post to extend to garage level | $50,000 |
| Oct 28, 2019 | Completed final sign-off Oct 2020 | 2639 17th Av | level one:expansion of habitable area with some excavation to create a nw split level. the extg bathroom & bedroom to be remodeled, and second bedroom, media room, laundry, & mechanical created. on level 2: remodel kitchen & bathroom and add 2nd bathroom. new stairway & windows added.Details
level one:expansion of habitable area with some excavation to create a nw split level. the extg bathroom & bedroom to be remodeled, and second bedroom, media room, laundry, & mechanical created. on level 2: remodel kitchen & bathroom and add 2nd bathroom. new stairway & windows added. | $250,000 |
| Oct 21, 2019 | Never finaled issued Oct 2019, no final | 337 Baden St | remodel of kitchen & bathroom. no altering of wallsDetails
remodel of kitchen & bathroom. no altering of walls | $10,000 |
| May 14, 2019 | Completed final sign-off Oct 2020 | 1026 Castro St | rooms down at garage incl fam rm, media rm, study rm, full bath, laundry. stair being added & partial infill of lightwell.Details
rooms down at garage incl fam rm, media rm, study rm, full bath, laundry. stair being added & partial infill of lightwell. | $100,000 |
| Dec 26, 2018 | Completed final sign-off Apr 2019 | 2106 Baker St | interior remodel of( e ) bathroom on the 2nd fl into 2 baths and laundry nookDetails
interior remodel of( e ) bathroom on the 2nd fl into 2 baths and laundry nook | $30,000 |
| Aug 8, 2018 | Expired or cancelled expired Apr 2025 | 37 Ashbury Tr | remodel two bathrooms on 2nd floor: remove & replace exist'g fixtures & tiles, new cabinets & new sheetrock. no new wall & no exist'g wall relocation. electrical & plumbing under separate permit. new lighting shall comply with cec 150.0(k)5.Details
remodel two bathrooms on 2nd floor: remove & replace exist'g fixtures & tiles, new cabinets & new sheetrock. no new wall & no exist'g wall relocation. electrical & plumbing under separate permit. new lighting shall comply with cec 150.0(k)5. | $30,000 |
| Jul 16, 2018 | Expired or cancelled expired Mar 2024 | 145 Divisadero St | rear interior renovatrion of top floor condo in 2 unit condo bldg, renovate (e) kitchen+bathroom, add closet and bathroom. no alteration to facade or exterior no addition in height of area. all work in unit 145.Details
rear interior renovatrion of top floor condo in 2 unit condo bldg, renovate (e) kitchen+bathroom, add closet and bathroom. no alteration to facade or exterior no addition in height of area. all work in unit 145. | $92,300 |
| May 30, 2018 | Completed final sign-off Jan 2019 | 744 Teresita Bl | remodel of (e) kitchen and bathroom on 1st level. remodel in an unoccupied garage area. adding full bathroom,mechanical room and den to garage level. replacing ground floor window with new sliding doors and replace & remove extg door.Details
remodel of (e) kitchen and bathroom on 1st level. remodel in an unoccupied garage area. adding full bathroom,mechanical room and den to garage level. replacing ground floor window with new sliding doors and replace & remove extg door. | $60,000 |
| Mar 16, 2018 | Never finaled issued Mar 2018, no final | 56 Surrey St | remodel of 3 bathrooms r&r fixtures & tiles in kind electrical & plumbing seperate permits (no alternation of nay (e) walls )Details
remodel of 3 bathrooms r&r fixtures & tiles in kind electrical & plumbing seperate permits (no alternation of nay (e) walls ) | $10,000 |
| Mar 5, 2018 | Never finaled issued Aug 2018, no final | 761 Tehama St | enclose existing spiral staircase at graage level with new walls and new door, demo part of existing wall in the upper floor to move sink from inside the bedroom to inside the master bathroom, new outlets and lightsDetails
enclose existing spiral staircase at graage level with new walls and new door, demo part of existing wall in the upper floor to move sink from inside the bedroom to inside the master bathroom, new outlets and lights | $3,000 |
| Aug 29, 2017 | Expired or cancelled expired Apr 2024 | 638 11th Av | 1)widening 1 window on the east facade. 2)new skylight in master bathroom. no work visible from the street.Details
1)widening 1 window on the east facade. 2)new skylight in master bathroom. no work visible from the street. | $3,000 |
| Aug 28, 2017 | Expired or cancelled expired May 2021 | 3896 19th St | remodel of bathroom & kitchen, replacement of fixtures, cabinets & tiles, lighting, plumbing.Details
remodel of bathroom & kitchen, replacement of fixtures, cabinets & tiles, lighting, plumbing. | $20,000 |
| Jun 19, 2017 | Expired or cancelled expired Mar 2024 | 638 11th Av | interior remodel converting 2 (e) bedrooms into a masterbedroom & mstr bath. replace 5 windows on the east side of the 2nd flr. new windows to be marvin fiberglass.Details
interior remodel converting 2 (e) bedrooms into a masterbedroom & mstr bath. replace 5 windows on the east side of the 2nd flr. new windows to be marvin fiberglass. | $25,000 |
| May 8, 2017 | Never finaled issued May 2017, no final | 307 Baden St | demolition, renovation and new construction (at "infill") to renovate and create living space on the ground floor. a new stair connection, new bedroom and bathroom & storage areas. the kitchen will be renovated. (n) walls, doors, windows, finishes, plumbing & electrical per plansDetails
demolition, renovation and new construction (at "infill") to renovate and create living space on the ground floor. a new stair connection, new bedroom and bathroom & storage areas. the kitchen will be renovated. (n) walls, doors, windows, finishes, plumbing & electrical per plans | $93,389 |
| Mar 17, 2017 | Never finaled issued Apr 2017, no final | 12 Divisadero St | renovation of lower unit of a 2 unit building. conversion of extg storage into habitable-family room with new connecting interior stair. add bathroom renovate kitchen. minor modification to rear door and window. sprinkler new spaces will be seperate permit.Details
renovation of lower unit of a 2 unit building. conversion of extg storage into habitable-family room with new connecting interior stair. add bathroom renovate kitchen. minor modification to rear door and window. sprinkler new spaces will be seperate permit. | $148,000 |
| Feb 28, 2017 | Never finaled issued Feb 2017, no final | 283 Dorland St | unit 302: remodel of bathroom, remodel consisting of replacing fixtures & tiles in kind.Details
unit 302: remodel of bathroom, remodel consisting of replacing fixtures & tiles in kind. | $10,000 |
| Feb 2, 2017 | Completed final sign-off Jun 2017 | 1350 California St | unit 407: replace of bathroom fixtures & tiles in kind. no alteration of wall, door and window.Details
unit 407: replace of bathroom fixtures & tiles in kind. no alteration of wall, door and window. | $10,000 |
| Nov 1, 2016 | Completed final sign-off Mar 2018 | 46 Sharon St | add new bathroom at 2nd fl unitDetails
add new bathroom at 2nd fl unit | $10,000 |
| May 16, 2016 | Never finaled issued Apr 2017, no final | 340 Molimo Dr | remodel extg 1/2 bath to full bath.Details
remodel extg 1/2 bath to full bath. | $10,000 |
| Apr 11, 2016 | Never finaled issued Apr 2016, no final | 311 Baden St | remodel of kitchen & 2 bathrooms in kind.Details
remodel of kitchen & 2 bathrooms in kind. | $10,000 |
| Feb 11, 2015 | Never finaled issued Mar 2015, no final | 2416 Chestnut St | revision to 201409196828. modify prviously approved bathroom fixture layout and bath walls and doorsDetails
revision to 201409196828. modify prviously approved bathroom fixture layout and bath walls and doors | |
| May 12, 2014 | Completed final sign-off Oct 2014 | 735 47th Av | remodel (e) kitchen, remove non-bearing wall and add a non bearing wall, add a sink to (e) toilet, remodel (e) bathroom. all work in second floor.Details
remodel (e) kitchen, remove non-bearing wall and add a non bearing wall, add a sink to (e) toilet, remodel (e) bathroom. all work in second floor. | $15,000 |
| May 1, 2014 | Completed final sign-off Oct 2014 | 735 47th Av | remodeling of 3 bathrooms and one kitchen into same locations.Details
remodeling of 3 bathrooms and one kitchen into same locations. | $10,000 |
| Nov 21, 2012 | Completed final sign-off Oct 2013 | 2585 Folsom St | convert e storage room into bedroom. lower floor into e craw l space to achieve 7'6 ceiling height. new sheetrock walls, wood floors and new electrical outlets. relocate furnace and change w water heater to tankless. add new few full bath where only 1 toilet exists. new finishes, plumbing, elec.Details
convert e storage room into bedroom. lower floor into e craw l space to achieve 7'6 ceiling height. new sheetrock walls, wood floors and new electrical outlets. relocate furnace and change w water heater to tankless. add new few full bath where only 1 toilet exists. new finishes, plumbing, elec. | $15,000 |
| Oct 2, 2012 | Completed final sign-off Dec 2012 | 3719 16th St | demo 2 existing 1/2 bathrooms finishes, plumbing fixtures, electrical and millwork. existing walls, windows, and doors to remain. install new flooring and tile, new plumbing and electrical. permanent lighting shall be efficacy or controlled by manual on occupancy sensors.Details
demo 2 existing 1/2 bathrooms finishes, plumbing fixtures, electrical and millwork. existing walls, windows, and doors to remain. install new flooring and tile, new plumbing and electrical. permanent lighting shall be efficacy or controlled by manual on occupancy sensors. | $21,500 |
| Oct 31, 2011 | Completed final sign-off Jan 2012 | 1106 Fulton St | remove existing wet bar w/sink & demolish (e) cabinetry & non-structural partition wall. add new bathroom w/new tile floor & shower. re-use salvaged toilet & pedestal sink.Details
remove existing wet bar w/sink & demolish (e) cabinetry & non-structural partition wall. add new bathroom w/new tile floor & shower. re-use salvaged toilet & pedestal sink. | $8,000 |
| Jun 21, 2011 | Completed final sign-off Aug 2011 | 3420 20th St | work for unit #3422-remodel bathroom, new tub/shower, new vanity, new floor & wall tiles. new related plumging & electrical.Details
work for unit #3422-remodel bathroom, new tub/shower, new vanity, new floor & wall tiles. new related plumging & electrical. | $10,000 |
| Jun 22, 2010 | Completed final sign-off Sep 2010 | 2667 15th Av | legalize (e) full bath at gr fl. replace (e) subfloor and finish floor and install new floor at lowered level to achieve 7'6 headroom. replace window at rear gr floor. convert storage to (n) family room.Details
legalize (e) full bath at gr fl. replace (e) subfloor and finish floor and install new floor at lowered level to achieve 7'6 headroom. replace window at rear gr floor. convert storage to (n) family room. | $18,000 |