Back to kitchen remodel contractors
Econ Build Inc
- Based in
- Stockton
- On San Francisco permits
- Apr 2025 to Apr 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 257 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2025 | Completed final sign-off Sep 2026 | 615 Mount Vernon Av | new 680 sf,1br,1 ba adu:legalize(e)udu on 1st level,under state adu program.demo(e)finishes,fixture,kitchen & bath.discovrey/repair of any dry rot,exterior evelope damage,etc.level(e)interior fl,close x2 (e)p.l. windows on n.w.facade,replace(e)windows on s.e.facade,(n)insulation,rough mep & drywall.Details
new 680 sf,1br,1 ba adu:legalize(e)udu on 1st level,under state adu program.demo(e)finishes,fixture,kitchen & bath.discovrey/repair of any dry rot,exterior evelope damage,etc.level(e)interior fl,close x2 (e)p.l. windows on n.w.facade,replace(e)windows on s.e.facade,(n)insulation,rough mep & drywall. | $65,000 |