Eco Village Costruction
- Based in
- Novato
- On San Francisco permits
- Jan 2001 to May 2019
- Last 24 months
- 0 permits filed
32 permits since 2000: 22 completed, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 269 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2006 | Completed final sign-off Jan 2007 | 15 States St | small fire repairs-replace insulation, sheetrock, roof deck, skylights, siding, tile, cabinets, plumbing, electrical, two patio doors, 3 windows all in like size and location.Details
small fire repairs-replace insulation, sheetrock, roof deck, skylights, siding, tile, cabinets, plumbing, electrical, two patio doors, 3 windows all in like size and location. | $100,000 |
| Oct 1, 2002 | Expired or cancelled expired Mar 2005 | 201 Mullen Av | replace roof deck ones garage with new framing sys. no chg in envelope.replace railing.Details
replace roof deck ones garage with new framing sys. no chg in envelope.replace railing. | $10,000 |