Eco Smart Builder
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Aug 2019
- Last 24 months
- 0 permits filed
157 permits since 2000: 122 completed, 28 never finaled, 7 expired or cancelled.
Of the 28 never-finaled permits, 13 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 7 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2018 | Completed final sign-off May 2020 | 551 25th Av | kitchen & bathroom remodeling for units #551 & #553. remove (e) finishes, install w/ new cabinets, appliances & flooring. prime & paint as needed. 400 sq ft total approx. upgrade electrical power.Details
kitchen & bathroom remodeling for units #551 & #553. remove (e) finishes, install w/ new cabinets, appliances & flooring. prime & paint as needed. 400 sq ft total approx. upgrade electrical power. | $70,971 |
| Jul 16, 2014 | Completed final sign-off Oct 2014 | 1 Capp St | replace kitchen cabinets, replace kitchen & bathroom flooring, replace ceiling with 1 hr rated eyp. bd., refinish wood flooring, paint interior, new partition (non bearing) in garage for storage room.Details
replace kitchen cabinets, replace kitchen & bathroom flooring, replace ceiling with 1 hr rated eyp. bd., refinish wood flooring, paint interior, new partition (non bearing) in garage for storage room. | $80,000 |
| Aug 22, 2011 | Completed final sign-off Dec 2011 | 665 Faxon Av | renovate (e) bathroom add new bathroom in existing square footage. no work visable from street. area of work equal to 175 sf.Details
renovate (e) bathroom add new bathroom in existing square footage. no work visable from street. area of work equal to 175 sf. | $20,366 |
| Feb 1, 2011 | Completed final sign-off Mar 2011 | 148 Otsego Av | bathroom remodel, tear down of existing drywall and tile, install new tile, drywall, shower membrane, toilet, vanity. provide high efficency light or "manual on" occupancy sensor.Details
bathroom remodel, tear down of existing drywall and tile, install new tile, drywall, shower membrane, toilet, vanity. provide high efficency light or "manual on" occupancy sensor. | $9,500 |