Back to kitchen remodel contractors
Eco Logical Builders
- Based in
- El Cerrito
- On San Francisco permits
- Sep 2011 to Nov 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2012 | Completed final sign-off Apr 2013 | 3895 22nd St | kitchen alteration:remove extg cabinets and fixures. add 4 new closets, add structural to roof support, add bathroom sinks (2), add 1 water closet, update electrical, relocate interior partiton walls. no changes to exterior.Details
kitchen alteration:remove extg cabinets and fixures. add 4 new closets, add structural to roof support, add bathroom sinks (2), add 1 water closet, update electrical, relocate interior partiton walls. no changes to exterior. | $50,000 |
| Oct 2, 2012 | Completed final sign-off Dec 2012 | 3888 22nd St | kitchen remodel-replace cabinets, sink, counter top. convert pantry into laundry roomDetails
kitchen remodel-replace cabinets, sink, counter top. convert pantry into laundry room | $20,000 |
| Sep 21, 2012 | Completed final sign-off Nov 2012 | 3893 22nd St | kitchen remodel: replace cabinets, countertops, (n) wood floor.Details
kitchen remodel: replace cabinets, countertops, (n) wood floor. | $15,000 |
| May 23, 2012 | Completed final sign-off Aug 2012 | 923 Minnesota St | bathroom remodel. remove and replace all fixtures, update electrical. replace kitchen cabinets. all work on 2nd fl. no exterior work.Details
bathroom remodel. remove and replace all fixtures, update electrical. replace kitchen cabinets. all work on 2nd fl. no exterior work. | $15,000 |