Back to kitchen remodel contractors
East Rainbow Electrical
- Based in
- San Francisco
- On San Francisco permits
- Oct 2009 to Dec 2012
- Last 24 months
- 0 permits filed
17 permits since 2000: 12 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 2 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2010 | Completed final sign-off Jun 2011 | 526 Funston Av | 1. construct one (n) bedroom, one (n) bath, one (n) common area, one (n) laundry, and one (n) storage on (e) ground flr; 2.install (n) middle footing on ground floor. 3. remodel (e) kitchen on 2nd floor, two (e) bath, and bedroom on 3rd floor. 4.replace (e) wh & (e) furnace.Details
1. construct one (n) bedroom, one (n) bath, one (n) common area, one (n) laundry, and one (n) storage on (e) ground flr; 2.install (n) middle footing on ground floor. 3. remodel (e) kitchen on 2nd floor, two (e) bath, and bedroom on 3rd floor. 4.replace (e) wh & (e) furnace. | $50,000 |
| Jun 1, 2010 | Completed final sign-off Jul 2010 | 282 Orizaba Av | comply w/nov#200903946 & 200793616. legalize (e) 1st. flr.: remove (e) kitchen, relocate wall between (e) garage & kitchen. convert (e) kitchen to a laundry room. replace (e) countertop only @ (e) kitchen, re-tile (e) bathtub wall only @ 2nd. flr. replace 2-(e) windows @ front @ 2nd. flr.Details
comply w/nov#200903946 & 200793616. legalize (e) 1st. flr.: remove (e) kitchen, relocate wall between (e) garage & kitchen. convert (e) kitchen to a laundry room. replace (e) countertop only @ (e) kitchen, re-tile (e) bathtub wall only @ 2nd. flr. replace 2-(e) windows @ front @ 2nd. flr. | $18,000 |
| Feb 22, 2010 | Completed final sign-off Mar 2011 | 173 Ellsworth St | revision to application 200804119485. relocate master bedroom, add 1 (n) bathroom at 1st floor. add 1 (n) door in rear at 1st floor. (not visible from street). relocate kitchen and dining at 2nd floor. repair (e) stair at rear in kind.Details
revision to application 200804119485. relocate master bedroom, add 1 (n) bathroom at 1st floor. add 1 (n) door in rear at 1st floor. (not visible from street). relocate kitchen and dining at 2nd floor. repair (e) stair at rear in kind. | $60,000 |
| Oct 15, 2009 | Completed final sign-off Feb 2010 | 160 Oxford St | gr fl add 2 new bedrooms, 1 playroom, 1 bathroom on 1st floor. enlarge 2 e window e at rear (not visible from street) convert e kitchen to a bedroom, relocate e kitchen, add 1 new half bath 2nd flr.Details
gr fl add 2 new bedrooms, 1 playroom, 1 bathroom on 1st floor. enlarge 2 e window e at rear (not visible from street) convert e kitchen to a bedroom, relocate e kitchen, add 1 new half bath 2nd flr. | $25,000 |