Back to kitchen remodel contractors
East Bay Home Impreovement
- Based in
- Castro Valley
- On San Francisco permits
- May 2006 to Apr 2009
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 2 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2009 | Completed final sign-off May 2009 | 1133 Mendell St | install kitchen cabinets & new countertop (provided by customer) install & connect garbage disposal, install connect kitchen sink, install vent hood & connect elctrical, & gas range. other contractor doing electrical upgrade.Details
install kitchen cabinets & new countertop (provided by customer) install & connect garbage disposal, install connect kitchen sink, install vent hood & connect elctrical, & gas range. other contractor doing electrical upgrade. | $6,500 |
| May 16, 2006 | Completed final sign-off Nov 2006 | 709 Anza St | install wash/dryer in each unit, reconnect kitchen plumbing on sink, replace disposal, install can lights in upper unit, outlets in the build.Details
install wash/dryer in each unit, reconnect kitchen plumbing on sink, replace disposal, install can lights in upper unit, outlets in the build. | $20,000 |