Back to kitchen remodel contractors
E Sykes Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2021
- Last 24 months
- 0 permits filed
60 permits since 2000: 49 completed, 3 never finaled, 8 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 456 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2020 | Completed final sign-off Aug 2020 | 62 Woodland Av | remeodel kitchen (13'x13') and powder room (40 sf)Details
remeodel kitchen (13'x13') and powder room (40 sf) | $45,000 |
| Aug 20, 2008 | Completed final sign-off Nov 2009 | 676 Funston Av | r/r sheetrock in exist living room. r/r tile & fixtures in exist bathroom & half bath. r/r cabinets sheetrock in exist kitchen. 50% of lighting kitchen will be florescent.Details
r/r sheetrock in exist living room. r/r tile & fixtures in exist bathroom & half bath. r/r cabinets sheetrock in exist kitchen. 50% of lighting kitchen will be florescent. | $80,000 |
| Oct 19, 2007 | Completed final sign-off Oct 2017 | 172 Lunado Ct | revision to p.a.#2006/0405/8268 to delete work on front stairs, kitchen remodel and bathroom remodel. (these items to be deleted from scope of work at this time) for final inspection.Details
revision to p.a.#2006/0405/8268 to delete work on front stairs, kitchen remodel and bathroom remodel. (these items to be deleted from scope of work at this time) for final inspection. | |
| Oct 10, 2007 | Completed final sign-off Jul 2010 | 4850 17th St | horizontal extension to existing building at: 1. 3/fl - new study & bathroom. 2. 2/fl - new breakfast room and remodeled (e) kitchen. 3. 1/fl - extend length of (e) garage & storage area under new 1st floor deck.Details
horizontal extension to existing building at: 1. 3/fl - new study & bathroom. 2. 2/fl - new breakfast room and remodeled (e) kitchen. 3. 1/fl - extend length of (e) garage & storage area under new 1st floor deck. | $200,000 |
| Sep 28, 2001 | Completed final sign-off Feb 2002 | 5 Bennington St | remodel kitchen (remove cabinet, install new)Details
remodel kitchen (remove cabinet, install new) | $19,250 |