E M R Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2015 to Jul 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 6 days from filing to permit and 19 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2015 | Completed final sign-off Aug 2015 | 845 Visitacion Av | to comply with nov 201085266. legalize complaint to remove lean to roof at front of building and new picket fence, reduce to 3 ft. new 6'-0" high fence between driveway and back stair . existing sidewalk to be repaired as needed.Details
to comply with nov 201085266. legalize complaint to remove lean to roof at front of building and new picket fence, reduce to 3 ft. new 6'-0" high fence between driveway and back stair . existing sidewalk to be repaired as needed. | $4,000 |