Back to bathroom remodel contractors
E & E General Builder Inc
- Based in
- San Pablo
- On San Francisco permits
- Jun 2015 to Mar 2026
- Last 24 months
- 5 permits filed
66 permits since 2000: 59 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 23 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2026 | Completed final sign-off May 2026 | 2376 46th Av | in kind master bathroom remodel.Details
in kind master bathroom remodel. | $35,000 |
| Aug 13, 2025 | Completed final sign-off Dec 2025 | 437 Day St | in kind bathroom renovation replace tub toilet vanity sink faucets and afan and scone lights including new tilesDetails
in kind bathroom renovation replace tub toilet vanity sink faucets and afan and scone lights including new tiles | $23,000 |
| Jul 11, 2025 | Completed final sign-off Aug 2026 | 2376 46th Av | new rear yard deck with stairs. remodel and legalize 815 sqft at 1st floor including 2 bedrooms, 1 bathroom and laundry. install new electrical heat pump to replace furnace. install new electric hybrid water heater. install new marvin doors at rear facade. height of deck shall not be above 10'-0"Details
new rear yard deck with stairs. remodel and legalize 815 sqft at 1st floor including 2 bedrooms, 1 bathroom and laundry. install new electrical heat pump to replace furnace. install new electric hybrid water heater. install new marvin doors at rear facade. height of deck shall not be above 10'-0" | $100,000 |
| May 5, 2025 | Completed final sign-off Dec 2025 | 437 Day St | in kind guest bathroom remodel, no wall removal or layout changes.Details
in kind guest bathroom remodel, no wall removal or layout changes. | $25,000 |
| Mar 20, 2024 | Completed final sign-off Jun 2024 | 573 Page St | existing split bath to be made into a bath & half with the addition of a toilet in the main bath & a small sink in the water closet, plumbing will be relocated for the additional toilet & for moving the tub & adding the sink. a nw ceiling fan & 3 can lights are the only electrical change. n0 strctrDetails
existing split bath to be made into a bath & half with the addition of a toilet in the main bath & a small sink in the water closet, plumbing will be relocated for the additional toilet & for moving the tub & adding the sink. a nw ceiling fan & 3 can lights are the only electrical change. n0 strctr | $20,000 |
| Mar 12, 2024 | Completed final sign-off Sep 2024 | 222 Scott St | kitchen remodel (in kind) , no new fixtures, same layout, no structural, 1 bath remodel (in kind) no new fixtures, same layout, no structural.Details
kitchen remodel (in kind) , no new fixtures, same layout, no structural, 1 bath remodel (in kind) no new fixtures, same layout, no structural. | $55,000 |
| Aug 29, 2023 | Completed final sign-off Jul 2024 | 1546 Baker St | in kind bathroom remodelDetails
in kind bathroom remodel | $37,500 |
| Aug 22, 2023 | Completed final sign-off Jun 2024 | 14 Beaver St | new full bathroom in bedroom 1.Details
new full bathroom in bedroom 1. | $5,000 |
| Oct 25, 2022 | Completed final sign-off Feb 2023 | 1022 Powell St | in kind bathroom remodelDetails
in kind bathroom remodel | $20,000 |
| May 13, 2022 | Completed final sign-off Dec 2022 | 438 Day St | in kind 2 bathrooms remodel at 2nd floor. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5.Details
in kind 2 bathrooms remodel at 2nd floor. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. | $60,000 |
| Nov 17, 2021 | Completed final sign-off Nov 2022 | 37 Chenery St | (e) bathroom will be fully demolish and new walls will be constructed to trace new bath, closet and powder room.interior garage door relocated. while no new sf will be added, approximately 500 sf of existing garage space will be converted into living space. new electrical fixtures and devices willDetails
(e) bathroom will be fully demolish and new walls will be constructed to trace new bath, closet and powder room.interior garage door relocated. while no new sf will be added, approximately 500 sf of existing garage space will be converted into living space. new electrical fixtures and devices will | $20,000 |
| Feb 19, 2021 | Completed final sign-off Nov 2022 | 324 Baden St | revision to pa 202009214624. install (n) rear deck less than 10'-0" height. dry rot repair of front stucco stair wall. infill (e) south lightwell 14 sq ft area. addition of 673.5 sq ft at 1st flr with (e) envelope incl 2 baths & nursery rm. install (n) high efficiency furnace and tankless water heatDetails
revision to pa 202009214624. install (n) rear deck less than 10'-0" height. dry rot repair of front stucco stair wall. infill (e) south lightwell 14 sq ft area. addition of 673.5 sq ft at 1st flr with (e) envelope incl 2 baths & nursery rm. install (n) high efficiency furnace and tankless water heat | $80,000 |
| Sep 21, 2020 | Completed final sign-off Nov 2022 | 324 Baden St | remodel (e) bathroom & (e) kitchen. fixture locations to remain the same. remodel (e) finishes in living room & bedrooms.Details
remodel (e) bathroom & (e) kitchen. fixture locations to remain the same. remodel (e) finishes in living room & bedrooms. | $70,000 |
| Jan 30, 2020 | Completed final sign-off Jan 2024 | 330 Baden St | new 2 story rear yard addition including 2 bedrooms & bathroom. new roof deck @ 2nd floor above 1st floor addition. remodel (e) house interior including kitchen & master bathroom. install new half bathroom. no work proposed @ front facade.Details
new 2 story rear yard addition including 2 bedrooms & bathroom. new roof deck @ 2nd floor above 1st floor addition. remodel (e) house interior including kitchen & master bathroom. install new half bathroom. no work proposed @ front facade. | $150,000 |
| Dec 31, 2019 | Completed final sign-off May 2020 | 37 Chenery St | 2nd floor bathroom remodel in kind. no structural workDetails
2nd floor bathroom remodel in kind. no structural work | $15,000 |
| Jul 26, 2019 | Completed final sign-off Sep 2019 | 4531 20th St | revision to application #201906102985. to correct scope description: should be in kind remodel 2 bathrooms, instead of 1.Details
revision to application #201906102985. to correct scope description: should be in kind remodel 2 bathrooms, instead of 1. | |
| Jun 10, 2019 | Completed final sign-off Sep 2019 | 4531 20th St | in kind bathroom remodel. plumbing not included.Details
in kind bathroom remodel. plumbing not included. | $35,000 |
| Jun 10, 2019 | Completed final sign-off Oct 2019 | 451 Day St | take out existing fixtures (bathrooms) add new tiles & fixtures to 1 bathroom and powder roomDetails
take out existing fixtures (bathrooms) add new tiles & fixtures to 1 bathroom and powder room | $12,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 2130 Pierce St | dry rot repair in-kind. siding repair in-kind. remove existing siding, (408 sq ft), replace any 2x that are damaged due to bathroom leaks, insatll new 1/2" structural #1 cdx, insatll new siding to match existing one.Details
dry rot repair in-kind. siding repair in-kind. remove existing siding, (408 sq ft), replace any 2x that are damaged due to bathroom leaks, insatll new 1/2" structural #1 cdx, insatll new siding to match existing one. | $7,000 |
| Nov 7, 2018 | Expired or cancelled cancelled Jan 2026 | 110 Channel | removing (e) doors loated in master bedroom, master bathroom, walk in closet. pre framing for new pocket door in master bedroom & naster bathroom. installing custom cabinetry in kitchenDetails
removing (e) doors loated in master bedroom, master bathroom, walk in closet. pre framing for new pocket door in master bedroom & naster bathroom. installing custom cabinetry in kitchen | $8,828 |
| Sep 6, 2018 | Completed final sign-off Nov 2019 | 720 Junipero Serra Bl | remodel existing kitchen remove fixtures & appliances & install new ones at same location. 2 bathrooms remove existing fixtures & replace the with new ones, same locationDetails
remodel existing kitchen remove fixtures & appliances & install new ones at same location. 2 bathrooms remove existing fixtures & replace the with new ones, same location | $81,000 |
| Oct 10, 2017 | Completed final sign-off Dec 2019 | 72 Elsie St | removal of enclosed storage porch and deck at backyard. addition of 235 sq ft at lower level and 206 sq ft at main level(entry level). new master bedroom and bathroom at lower level. new living room at upper level. mechanical, plumbing, electrical as req'd. minor cabinetry at kitchen.Details
removal of enclosed storage porch and deck at backyard. addition of 235 sq ft at lower level and 206 sq ft at main level(entry level). new master bedroom and bathroom at lower level. new living room at upper level. mechanical, plumbing, electrical as req'd. minor cabinetry at kitchen. | $100,000 |
| Jun 22, 2017 | Completed final sign-off May 2018 | 50 Encline Ct | expand 1st floor bathroom closet. rear exterior wall to be demolished and construct new. foundation at rear to be constructed new. install a steel frame 12' clear span and a 12' sliding door(max u factor 0.32). no exterior work will be done. visible from streetDetails
expand 1st floor bathroom closet. rear exterior wall to be demolished and construct new. foundation at rear to be constructed new. install a steel frame 12' clear span and a 12' sliding door(max u factor 0.32). no exterior work will be done. visible from street | $40,000 |
| Mar 31, 2017 | Completed final sign-off Oct 2017 | 1422 Revere Av | remodel (e) bath. add 2 baths on 1st flr, one additional on 2nd flr. build interior partitions on 1st. remodel kitchen, change lighting, replace plumbing. replace window in rear. replace door in rear , repair damaged joists; foundation retro - install anchor bolts.Details
remodel (e) bath. add 2 baths on 1st flr, one additional on 2nd flr. build interior partitions on 1st. remodel kitchen, change lighting, replace plumbing. replace window in rear. replace door in rear , repair damaged joists; foundation retro - install anchor bolts. | $85,000 |
| Dec 2, 2016 | Completed final sign-off Mar 2018 | 530 44th Av | fill-in light well to create new stair, new bedroom, bathroom, sitting room and laundry in 1st floor. partly in new enclosed space and partly within extg garage space. horizontal addition.Details
fill-in light well to create new stair, new bedroom, bathroom, sitting room and laundry in 1st floor. partly in new enclosed space and partly within extg garage space. horizontal addition. | $100,000 |