Back to kitchen remodel contractors
Dwp Co.
- Based in
- San Franciso
- On San Francisco permits
- May 2005 to Aug 2025
- Last 24 months
- 1 permit filed
28 permits since 2000: 14 completed, 5 never finaled, 9 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 5 completed, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2016 | Completed final sign-off Sep 2016 | 2585 Union St | #4 - remodel one kitchen - new floor, cabintes, fixtures, appliance, recess lights led. remodel one bathroom - new vanity, toilet, floors. no walls removed or added, all fixture to remain same except kitchen & bath.Details
#4 - remodel one kitchen - new floor, cabintes, fixtures, appliance, recess lights led. remodel one bathroom - new vanity, toilet, floors. no walls removed or added, all fixture to remain same except kitchen & bath. | $25,000 |
| May 7, 2015 | Completed final sign-off Sep 2016 | 2585 Union St | unit #3 remodel kitchen - cabinets, floors & new lighting 50% high efficacy. remodel bathroom. new vanity, toilet, tile & occupancy sensor. cec 150 (k). no change to exhaust system. no walls moved. removed or added. all fixture layouts to remain unchanged.Details
unit #3 remodel kitchen - cabinets, floors & new lighting 50% high efficacy. remodel bathroom. new vanity, toilet, tile & occupancy sensor. cec 150 (k). no change to exhaust system. no walls moved. removed or added. all fixture layouts to remain unchanged. | $25,000 |
| Jan 16, 2015 | Expired or cancelled cancelled Mar 2026 | 2145 North Point St | second floor remodel kitchen and bathroom. add 1/2 bath in bedroom.Details
second floor remodel kitchen and bathroom. add 1/2 bath in bedroom. | $20,000 |
| Jul 22, 2013 | Never finaled issued Jul 2013, no final | 3249 Gough St | apt #3: new kitchen cabinets, remove bathrm vanities, repl with new, remove bath tubs, install new showers (2), change all interior doors to solid core, new tile floors in kit and bathrms, no new lightingDetails
apt #3: new kitchen cabinets, remove bathrm vanities, repl with new, remove bath tubs, install new showers (2), change all interior doors to solid core, new tile floors in kit and bathrms, no new lighting | $30,000 |
| Jun 7, 2012 | Never finaled issued Jun 2012, no final | 2585 Union St | remodel (e) unit-new wall, electrical, heating system. move kitchen & some interior walls. some new plumbing & replace(8) windows (4 visible from street).Details
remodel (e) unit-new wall, electrical, heating system. move kitchen & some interior walls. some new plumbing & replace(8) windows (4 visible from street). | $35,000 |
| May 18, 2011 | Expired or cancelled expired Oct 2014 | 2585 Union St | unit # 5 only:remodel kitchen. new carpet and appliances. remodel bathrom new vanity,toilet, and tile.kitchen: atleast 50% high efficacy (he) lighting. bathroom: he or occupancy sensor, cec 150(k). no change to exhaust system.Details
unit # 5 only:remodel kitchen. new carpet and appliances. remodel bathrom new vanity,toilet, and tile.kitchen: atleast 50% high efficacy (he) lighting. bathroom: he or occupancy sensor, cec 150(k). no change to exhaust system. | $25,000 |
| Jan 19, 2011 | Completed final sign-off May 2011 | 1 Daniel Burnham Ct | unit #514 - replace old cabients & countertops in the kitchen. no change to (e) lighting, no change to exhaust system. no widnow, door walls ceiling on this permit.Details
unit #514 - replace old cabients & countertops in the kitchen. no change to (e) lighting, no change to exhaust system. no widnow, door walls ceiling on this permit. | $5,000 |
| Apr 2, 2009 | Completed final sign-off Jun 2009 | 2585 Union St | work on unit#2. remodel kitchen + bath new elec panel-new kit cabinets, new vanity, toilet, shower valve. existing kitchen + bath. no structural work.Details
work on unit#2. remodel kitchen + bath new elec panel-new kit cabinets, new vanity, toilet, shower valve. existing kitchen + bath. no structural work. | $25,000 |
| May 21, 2008 | Expired or cancelled expired Dec 2008 | 2601 Greenwich St | work on unit#6 only. kitchen remodel .relocate gas line apt#3,#6,#9 plumbing permit separate.Details
work on unit#6 only. kitchen remodel .relocate gas line apt#3,#6,#9 plumbing permit separate. | $9,000 |
| Mar 3, 2008 | Expired or cancelled expired Dec 2008 | 2601 Greenwich St | kitchen remodel apt #3. install new sheet rock relocate outlets. relocate gas linesDetails
kitchen remodel apt #3. install new sheet rock relocate outlets. relocate gas lines | $9,000 |
| Nov 1, 2005 | Completed final sign-off Apr 2006 | 2201 Sacramento St | new kitchen cabinets and tile countertop and new tile floor, kitchen onlyDetails
new kitchen cabinets and tile countertop and new tile floor, kitchen only | $15,000 |