Back to bathroom remodel contractors
Duhsan Medan Construction Comp
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Mar 2026
- Last 24 months
- 1 permit filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2026 | Completed final sign-off Aug 2026 | 3455 Pierce St | unit 203: remodel kitchen and bathroom, no structual work, all fixtures to remain the same, tub to shower conversion.Details
unit 203: remodel kitchen and bathroom, no structual work, all fixtures to remain the same, tub to shower conversion. | $30,000 |
| Jan 24, 2024 | Completed final sign-off Mar 2026 | 3330 Pierce St | unit 204: remodel kitchen and bathroom, no walls removed or added. all appliances to remain in existing locations.Details
unit 204: remodel kitchen and bathroom, no walls removed or added. all appliances to remain in existing locations. | $30,000 |
| Jun 7, 2022 | Completed final sign-off Nov 2022 | 2290 Francisco St | unit #302: remodel (1) bathroom & (1) kitchen. all fixtures will remain in same location. no structural work.Details
unit #302: remodel (1) bathroom & (1) kitchen. all fixtures will remain in same location. no structural work. | $30,000 |
| Jun 7, 2022 | Completed final sign-off Mar 2023 | 220 Mallorca Wy | remodel (2) bathrooms. no structural work. work in-kind.Details
remodel (2) bathrooms. no structural work. work in-kind. | $20,000 |
| Feb 28, 2022 | Completed final sign-off Jun 2022 | 3330 Pierce St | unit 102: kitchen and bath remodel. no structural work. all appliance to remain in existing locations. no alterations to outside of building.Details
unit 102: kitchen and bath remodel. no structural work. all appliance to remain in existing locations. no alterations to outside of building. | $30,000 |
| Jan 11, 2022 | Completed final sign-off Jun 2022 | 3330 Pierce St | unit #103. (1) kitchen & (1) bathroom remodel. no structural work. all appliances to remain in existing locations. no alterations of wall, window or door.Details
unit #103. (1) kitchen & (1) bathroom remodel. no structural work. all appliances to remain in existing locations. no alterations of wall, window or door. | $30,000 |
| Apr 1, 2021 | Completed final sign-off Aug 2021 | 1322 28th Av | in kind kitchen and bathroom remodel. no changes to floor plan or wallsDetails
in kind kitchen and bathroom remodel. no changes to floor plan or walls | $30,000 |
| Jun 30, 2020 | Completed final sign-off Dec 2020 | 3445 Pierce St | unit #104 & #105: remodel 2 bathrooms and 2 kitchens in kind. bathrooms replacing tub, sink, toilet, sink faucet, shower valve & tile installed. kitchens replacing cabinets, appliances, countertops, tile floor and faucet installed. size of the bathrooms 5ft x 8ft. size of the kitchens 8ft x 12ft.Details
unit #104 & #105: remodel 2 bathrooms and 2 kitchens in kind. bathrooms replacing tub, sink, toilet, sink faucet, shower valve & tile installed. kitchens replacing cabinets, appliances, countertops, tile floor and faucet installed. size of the bathrooms 5ft x 8ft. size of the kitchens 8ft x 12ft. | $60,000 |
| Apr 4, 2018 | Completed final sign-off Jan 2019 | 2617 Octavia St | renovate existing kitchen & bathroom, add new half bath. no other workDetails
renovate existing kitchen & bathroom, add new half bath. no other work | $50,000 |