Duhsan Medan Construction Comp
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Mar 2026
- Last 24 months
- 1 permit filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2026 | Completed final sign-off Aug 2026 | 3455 Pierce St | unit 203: remodel kitchen and bathroom, no structual work, all fixtures to remain the same, tub to shower conversion.Details
unit 203: remodel kitchen and bathroom, no structual work, all fixtures to remain the same, tub to shower conversion. | $30,000 |
| Apr 29, 2024 | Completed final sign-off Mar 2025 | 3330 Pierce St | convert existing storage area into laundry room. no structural walls to be removed.Details
convert existing storage area into laundry room. no structural walls to be removed. | $20,000 |
| Jan 24, 2024 | Completed final sign-off Mar 2026 | 3330 Pierce St | unit 204: remodel kitchen and bathroom, no walls removed or added. all appliances to remain in existing locations.Details
unit 204: remodel kitchen and bathroom, no walls removed or added. all appliances to remain in existing locations. | $30,000 |
| Jun 7, 2022 | Completed final sign-off Mar 2023 | 220 Mallorca Wy | remodel (2) bathrooms. no structural work. work in-kind.Details
remodel (2) bathrooms. no structural work. work in-kind. | $20,000 |
| Jun 7, 2022 | Completed final sign-off Nov 2022 | 2290 Francisco St | unit #302: remodel (1) bathroom & (1) kitchen. all fixtures will remain in same location. no structural work.Details
unit #302: remodel (1) bathroom & (1) kitchen. all fixtures will remain in same location. no structural work. | $30,000 |
| Feb 28, 2022 | Completed final sign-off Jun 2022 | 3330 Pierce St | unit 102: kitchen and bath remodel. no structural work. all appliance to remain in existing locations. no alterations to outside of building.Details
unit 102: kitchen and bath remodel. no structural work. all appliance to remain in existing locations. no alterations to outside of building. | $30,000 |
| Jan 11, 2022 | Completed final sign-off Jun 2022 | 3330 Pierce St | unit #103. (1) kitchen & (1) bathroom remodel. no structural work. all appliances to remain in existing locations. no alterations of wall, window or door.Details
unit #103. (1) kitchen & (1) bathroom remodel. no structural work. all appliances to remain in existing locations. no alterations of wall, window or door. | $30,000 |
| Apr 1, 2021 | Completed final sign-off Aug 2021 | 1322 28th Av | in kind kitchen and bathroom remodel. no changes to floor plan or wallsDetails
in kind kitchen and bathroom remodel. no changes to floor plan or walls | $30,000 |
| Jun 30, 2020 | Completed final sign-off Dec 2020 | 3445 Pierce St | unit #104 & #105: remodel 2 bathrooms and 2 kitchens in kind. bathrooms replacing tub, sink, toilet, sink faucet, shower valve & tile installed. kitchens replacing cabinets, appliances, countertops, tile floor and faucet installed. size of the bathrooms 5ft x 8ft. size of the kitchens 8ft x 12ft.Details
unit #104 & #105: remodel 2 bathrooms and 2 kitchens in kind. bathrooms replacing tub, sink, toilet, sink faucet, shower valve & tile installed. kitchens replacing cabinets, appliances, countertops, tile floor and faucet installed. size of the bathrooms 5ft x 8ft. size of the kitchens 8ft x 12ft. | $60,000 |
| Dec 30, 2019 | Completed final sign-off Jan 2022 | 1422 11th Av | legalization of existing dwelling unit per ordinance 43-14. accessory structure in rear yardDetails
legalization of existing dwelling unit per ordinance 43-14. accessory structure in rear yard | $15,000 |
| May 17, 2018 | Completed final sign-off Apr 2019 | 2617 Octavia St | renovation to (e) 2nd fl, relocate walls & add new finishes, no exterior workDetails
renovation to (e) 2nd fl, relocate walls & add new finishes, no exterior work | $50,000 |
| Apr 4, 2018 | Completed final sign-off Jan 2019 | 2617 Octavia St | renovate existing kitchen & bathroom, add new half bath. no other workDetails
renovate existing kitchen & bathroom, add new half bath. no other work | $50,000 |