Back to bathroom remodel contractors
Duggan Development
- Based in
- Daly City
- On San Francisco permits
- Jan 2022 to May 2026
- Last 24 months
- 5 permits filed
16 permits since 2000: 12 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | In progress issued May 2026 | 10 Shore View Av | remodel (e) bathroom in-kind. new shower pan and tile replace with new bathroom fixtures. no wall to be removed.Details
remodel (e) bathroom in-kind. new shower pan and tile replace with new bathroom fixtures. no wall to be removed. | $30,000 |
| Feb 23, 2023 | Completed final sign-off Dec 2023 | 464 Day St | remodel existing bathroom add one vnaity and 4 recessed cans. non structural.Details
remodel existing bathroom add one vnaity and 4 recessed cans. non structural. | $28,000 |
| Feb 10, 2023 | Completed final sign-off Jul 2023 | 933 Noe St | respond to planning nov 2022-009339enf. repalce (e) gas range w/ new 2 burner cooktop. legalize ground fl living rm, secondary kitchen, bath, storage, laundry, bonus room, and fire rated egress @ hallway ground level.Details
respond to planning nov 2022-009339enf. repalce (e) gas range w/ new 2 burner cooktop. legalize ground fl living rm, secondary kitchen, bath, storage, laundry, bonus room, and fire rated egress @ hallway ground level. | $1,000 |
| Jan 6, 2022 | Completed final sign-off Aug 2022 | 488 Gold Mine Dr | bathroom remodel in kind. tiles, change tub to shower, new toilet, new sink/vanity. no wall layout changes.Details
bathroom remodel in kind. tiles, change tub to shower, new toilet, new sink/vanity. no wall layout changes. | $35,000 |