Back to bathroom remodel contractors
Dueck Construction
- Based in
- Pacifica
- On San Francisco permits
- Nov 2001 to Jun 2022
- Last 24 months
- 0 permits filed
29 permits since 2000: 21 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 4 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2018 | Completed final sign-off Oct 2019 | 1730 Noe St | replace finish flooring, replace plaster partial wall @ lv room/ hallway / dining wall finishes with drywall. remodel bathroom, replace tub/vanity; remove & reinstall toilet, replace furnace & ductwork, install exhaust fan & light fixture.Details
replace finish flooring, replace plaster partial wall @ lv room/ hallway / dining wall finishes with drywall. remodel bathroom, replace tub/vanity; remove & reinstall toilet, replace furnace & ductwork, install exhaust fan & light fixture. | $10,000 |
| May 10, 2018 | Completed final sign-off Aug 2018 | 8 Sherwood Ct | bathroom remodel: change tile, vanity, shower control, add lights & skylights, fanDetails
bathroom remodel: change tile, vanity, shower control, add lights & skylights, fan | $22,000 |
| Jun 13, 2011 | Completed final sign-off Mar 2012 | 2 Entrada Ct | remodel master bedroom. demo closet, construct 1/2 bath. new closet in master bedroom, new walls non structuralDetails
remodel master bedroom. demo closet, construct 1/2 bath. new closet in master bedroom, new walls non structural | $35,000 |
| Apr 24, 2009 | Expired or cancelled expired Apr 2011 | 1996 21st Av | revise kitchen layout under pa# 2007-0518-1708, revise bathroom layout under pa# 2007-0626-5201-adding 2 skylights in kitchen per plan.Details
revise kitchen layout under pa# 2007-0518-1708, revise bathroom layout under pa# 2007-0626-5201-adding 2 skylights in kitchen per plan. | $30,000 |
| Jan 27, 2009 | Completed final sign-off Sep 2009 | 811 Filbert St | unit #817-kitchen & bathroom remodel-upgrade electrical, plumbing. add built in cabinets, bedroom-open door for closet. balance of work cosmetic improvementsDetails
unit #817-kitchen & bathroom remodel-upgrade electrical, plumbing. add built in cabinets, bedroom-open door for closet. balance of work cosmetic improvements | $50,000 |
| Jan 11, 2007 | Completed final sign-off Mar 2007 | 379 19th Av | legalize bathroom remodel. replace plumbing fixtures, toilet sink, floor covering and electrical fixtures. add a heating duct. restore wall original state where new window was constructed illegally.Details
legalize bathroom remodel. replace plumbing fixtures, toilet sink, floor covering and electrical fixtures. add a heating duct. restore wall original state where new window was constructed illegally. | $4,100 |