Dueck Construction
- Based in
- Pacifica
- On San Francisco permits
- Nov 2001 to Jun 2022
- Last 24 months
- 0 permits filed
29 permits since 2000: 21 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2022 | Never finaled issued Jul 2023, no final | 916 Kearny St | conversion of floors 3-6 from offie to tourist hotel rooms per pc motion 20773. restore basement path of travel; cosmetic changes to lobby; no exterior work building will operate as single tenant; existing dwelling unit to remain. mep deferred.Details
conversion of floors 3-6 from offie to tourist hotel rooms per pc motion 20773. restore basement path of travel; cosmetic changes to lobby; no exterior work building will operate as single tenant; existing dwelling unit to remain. mep deferred. | $2,000,000 |
| Sep 7, 2018 | Completed final sign-off Oct 2019 | 1730 Noe St | replace finish flooring, replace plaster partial wall @ lv room/ hallway / dining wall finishes with drywall. remodel bathroom, replace tub/vanity; remove & reinstall toilet, replace furnace & ductwork, install exhaust fan & light fixture.Details
replace finish flooring, replace plaster partial wall @ lv room/ hallway / dining wall finishes with drywall. remodel bathroom, replace tub/vanity; remove & reinstall toilet, replace furnace & ductwork, install exhaust fan & light fixture. | $10,000 |
| May 10, 2018 | Completed final sign-off Aug 2018 | 8 Sherwood Ct | bathroom remodel: change tile, vanity, shower control, add lights & skylights, fanDetails
bathroom remodel: change tile, vanity, shower control, add lights & skylights, fan | $22,000 |
| Jun 12, 2017 | Completed final sign-off Aug 2017 | 28 Elsie St | (a) re-install glass doors (2) all work ot be replaced in kind, (b) deck railing, (c) gutter drain, no work visible from the street.Details
(a) re-install glass doors (2) all work ot be replaced in kind, (b) deck railing, (c) gutter drain, no work visible from the street. | $24,345 |
| Jan 27, 2016 | Completed final sign-off Dec 2017 | 1999 Broadway | #72- revision to appl #201404072626: revise fire rated floor detail per ab-005.Details
#72- revision to appl #201404072626: revise fire rated floor detail per ab-005. | |
| Sep 15, 2014 | Completed final sign-off Oct 2014 | 6 August Al | replace existing aluminum windows (single pane) with double pane windows. street facing. 6 casement windows; aluminum clad wood marvin. add stucco trim to first floor to match existing.Details
replace existing aluminum windows (single pane) with double pane windows. street facing. 6 casement windows; aluminum clad wood marvin. add stucco trim to first floor to match existing. | $16,185 |
| Apr 7, 2014 | Completed final sign-off Dec 2017 | 1999 Broadway | renovate and expand sunroom that is part of unit 72.Details
renovate and expand sunroom that is part of unit 72. | $40,000 |
| Feb 12, 2013 | Never finaled issued Feb 2013, no final | 1996 21st Av | to obtain final inspection for work approved under pa# 200705181708. all work is complete.Details
to obtain final inspection for work approved under pa# 200705181708. all work is complete. | |
| Feb 12, 2013 | Never finaled issued Feb 2013, no final | 1996 21st Av | to obtain final inspection for work approved under pa# 200706265201. all work is complete.Details
to obtain final inspection for work approved under pa# 200706265201. all work is complete. | |
| Feb 12, 2013 | Never finaled issued Feb 2013, no final | 1996 21st Av | to obtain final inspection for work approved under pa# 200904247014. all work is complete.Details
to obtain final inspection for work approved under pa# 200904247014. all work is complete. | |
| Oct 23, 2012 | Expired or cancelled cancelled Jan 2026 | 55 Alpine Tr | fire escape removal in rearDetails
fire escape removal in rear | $1,200 |
| Aug 20, 2012 | Completed final sign-off Dec 2012 | 2010 Bush St | replace existing dry rotted deck framing, decking and front entry stair per plan in kind. work to be done in common area.Details
replace existing dry rotted deck framing, decking and front entry stair per plan in kind. work to be done in common area. | $5,000 |
| Aug 6, 2012 | Completed final sign-off Aug 2012 | 588 Miramar Av | replace dryrot wood on deck & stairs. less than 50% stringer, posts, steps, rear of bldg.Details
replace dryrot wood on deck & stairs. less than 50% stringer, posts, steps, rear of bldg. | $3,100 |
| Jun 13, 2011 | Completed final sign-off Mar 2012 | 2 Entrada Ct | remodel master bedroom. demo closet, construct 1/2 bath. new closet in master bedroom, new walls non structuralDetails
remodel master bedroom. demo closet, construct 1/2 bath. new closet in master bedroom, new walls non structural | $35,000 |
| Mar 28, 2011 | Never finaled issued Mar 2011, no final | 2 Entrada Ct | Details
| $18,700 |
| Oct 6, 2010 | Completed final sign-off Oct 2010 | 916 Kearny St | replace 4 metal studds (18ga) @ 16", 5/8 sheetrock on both sides, paneling. replace in kind. no structural changes.Details
replace 4 metal studds (18ga) @ 16", 5/8 sheetrock on both sides, paneling. replace in kind. no structural changes. | $5,000 |
| Sep 23, 2010 | Completed final sign-off Oct 2010 | 1470 Golden Gate Av | repair work on west wall & decks due to storm water leakage. work less than 50%. visible from street.Details
repair work on west wall & decks due to storm water leakage. work less than 50%. visible from street. | $18,699 |
| Jan 25, 2010 | Completed final sign-off Jun 2010 | 321 Moultrie St | replace (e) front stairway with 2 seperate stairways per planDetails
replace (e) front stairway with 2 seperate stairways per plan | $8,000 |
| Apr 24, 2009 | Expired or cancelled expired Apr 2011 | 1996 21st Av | revise kitchen layout under pa# 2007-0518-1708, revise bathroom layout under pa# 2007-0626-5201-adding 2 skylights in kitchen per plan.Details
revise kitchen layout under pa# 2007-0518-1708, revise bathroom layout under pa# 2007-0626-5201-adding 2 skylights in kitchen per plan. | $30,000 |
| Jan 27, 2009 | Completed final sign-off Sep 2009 | 811 Filbert St | unit #817-kitchen & bathroom remodel-upgrade electrical, plumbing. add built in cabinets, bedroom-open door for closet. balance of work cosmetic improvementsDetails
unit #817-kitchen & bathroom remodel-upgrade electrical, plumbing. add built in cabinets, bedroom-open door for closet. balance of work cosmetic improvements | $50,000 |
| Oct 30, 2007 | Completed final sign-off Mar 2008 | 167 23rd Av | demolition exist wood railing on porch. enclose porch including a door and window. add exterior light.Details
demolition exist wood railing on porch. enclose porch including a door and window. add exterior light. | $5,750 |
| Feb 2, 2007 | Completed final sign-off Mar 2007 | 379 19th Av | build water closet, install toilet, sink, fan light fixture, floor covering. close off window to exterior at g/fDetails
build water closet, install toilet, sink, fan light fixture, floor covering. close off window to exterior at g/f | $4,100 |
| Jan 11, 2007 | Completed final sign-off Mar 2007 | 379 19th Av | legalize bathroom remodel. replace plumbing fixtures, toilet sink, floor covering and electrical fixtures. add a heating duct. restore wall original state where new window was constructed illegally.Details
legalize bathroom remodel. replace plumbing fixtures, toilet sink, floor covering and electrical fixtures. add a heating duct. restore wall original state where new window was constructed illegally. | $4,100 |
| Dec 16, 2005 | Completed final sign-off Feb 2006 | 1205 Kearny St | replace aluminum windows with wood window. lower part panel & sheetrock inside. u factor. 0.67. 2 windows.Details
replace aluminum windows with wood window. lower part panel & sheetrock inside. u factor. 0.67. 2 windows. | $5,950 |
| Jul 3, 2003 | Completed final sign-off Oct 2003 | 1838 Grant Av | back siding removed-gas, water & electrical repaired & added insulated new siding 5 windows. 3 in liDetails
back siding removed-gas, water & electrical repaired & added insulated new siding 5 windows. 3 in li | $19,985 |
| Nov 25, 2002 | Completed final sign-off Sep 2018 | 133 12th Av | change dryer hose vent/install handrail/fireplace trim/rev. app #200211081100Details
change dryer hose vent/install handrail/fireplace trim/rev. app #200211081100 | |
| Nov 8, 2002 | Completed final sign-off Dec 2002 | 133 12th Av | change dryer hose to metal/install handrail/trim window at lightwell/reattach fire placeDetails
change dryer hose to metal/install handrail/trim window at lightwell/reattach fire place | $750 |
| Jun 19, 2002 | Expired or cancelled expired Oct 2002 | 1961 15th St | repair stairs. rear exterior stairs & landings. less than 50% repair in kind.Details
repair stairs. rear exterior stairs & landings. less than 50% repair in kind. | $2,500 |
| Nov 5, 2001 | Completed final sign-off Mar 2002 | 1077 Dolores St | repair exterior side stairs to comply nov#200119887Details
repair exterior side stairs to comply nov#200119887 | $3,750 |