Back to kitchen remodel contractors
Duane Ernst Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Feb 2026
- Last 24 months
- 3 permits filed
20 permits since 2000: 20 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 173 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2024 | Completed final sign-off Dec 2024 | 1655 Plymouth Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $35,000 |
| May 15, 2024 | Completed final sign-off Nov 2024 | 547 19th Av | one cosmetic kitchen remodel,new countertops,tile backsplash, new light fixtures, appliances and range hood. powder room, dmv and supply new corner mount sink, new exhaust fan, duplex outlet main bathroom, replace shower valve and fixtures, same location, new tile, vanity, lighting. same footprint.Details
one cosmetic kitchen remodel,new countertops,tile backsplash, new light fixtures, appliances and range hood. powder room, dmv and supply new corner mount sink, new exhaust fan, duplex outlet main bathroom, replace shower valve and fixtures, same location, new tile, vanity, lighting. same footprint. | $30,000 |
| Nov 3, 2023 | Completed final sign-off Jun 2024 | 549 19th Av | interior kitchen remodel: new fixtures and finishes, interior bathroom remodel new fixtures and finishes, interior hall bath remodel, expansion, new fixtures and finishes, removal of entry foyer coat closet, in-kind replacement ligtwell windowDetails
interior kitchen remodel: new fixtures and finishes, interior bathroom remodel new fixtures and finishes, interior hall bath remodel, expansion, new fixtures and finishes, removal of entry foyer coat closet, in-kind replacement ligtwell window | $128,483 |
| Dec 29, 2022 | Completed final sign-off Jun 2023 | 1433 Page St | kitchen remodel in existing footprint. no strutural work. new cabinets, countertops, oak flooring. new applinces, range hood. update eelctrical as necessary; circuits for small appliances, lighting, dishwasher, garbage disposal, range water line for refrigerator, gas hookup and shutoff valve for aDetails
kitchen remodel in existing footprint. no strutural work. new cabinets, countertops, oak flooring. new applinces, range hood. update eelctrical as necessary; circuits for small appliances, lighting, dishwasher, garbage disposal, range water line for refrigerator, gas hookup and shutoff valve for a | $40,000 |
| Sep 11, 2014 | Completed final sign-off Apr 2015 | 1351 15th Av | kitchen remodel & relocation, new opening between (e) & (n) locations, new 1/2 bath in former kitchen location, new master bath in (e) master closet. relocate washer/dryer.Details
kitchen remodel & relocation, new opening between (e) & (n) locations, new 1/2 bath in former kitchen location, new master bath in (e) master closet. relocate washer/dryer. | $75,000 |
| Jul 26, 2013 | Completed final sign-off Dec 2013 | 308 Scott St | remodel kitchen (e) footprint, enlarge opening between kitchen & living room. remodel bathroom (e) foot print. remove non bearing walls forming closet in living roomDetails
remodel kitchen (e) footprint, enlarge opening between kitchen & living room. remodel bathroom (e) foot print. remove non bearing walls forming closet in living room | $35,000 |
| Jun 9, 2011 | Completed final sign-off Oct 2011 | 53 Santa Ynez Av | second floor remove doors/wall between kitchen, dining and hallway, add two windows to kitchen northeast wall, kitchen remodel: update electrical, relocate sink , plumbing, kitchen sheetrock, new cabinets & counter, appliances, range hood. remove (e) closet and pantry.Details
second floor remove doors/wall between kitchen, dining and hallway, add two windows to kitchen northeast wall, kitchen remodel: update electrical, relocate sink , plumbing, kitchen sheetrock, new cabinets & counter, appliances, range hood. remove (e) closet and pantry. | $25,000 |