Dromhus Inc.
- Based in
- Menlo Park
- On San Francisco permits
- Aug 2003 to May 2023
- Last 24 months
- 0 permits filed
71 permits since 2000: 48 completed, 18 never finaled, 5 expired or cancelled.
Of the 18 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 9 completed, 2 never finaled. Typically 12 days from filing to permit and 778 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 1, 2021 | Never finaled issued Nov 2021, no final | 79 Collins St | demo of (e) finishes at walls, ceilings and stairs at lower level. first floor to verify substrate conditionDetails
demo of (e) finishes at walls, ceilings and stairs at lower level. first floor to verify substrate condition | $2,000 |
| Mar 9, 2016 | Completed final sign-off May 2018 | 840 Union St | revision to app#201109063947 s/1: 1) site wall revision to leave a portion of extg wall for v.e. 2) the depressed framing of the shower area has been revised. 3) the roof structure on the 3rd floor has been upgraded. 4) the stair landing at the 3rd floor has been revised to a steel plate.Details
revision to app#201109063947 s/1: 1) site wall revision to leave a portion of extg wall for v.e. 2) the depressed framing of the shower area has been revised. 3) the roof structure on the 3rd floor has been upgraded. 4) the stair landing at the 3rd floor has been revised to a steel plate. | |
| Apr 3, 2015 | Never finaled issued Apr 2015, no final | 25 Belgrave Av | revision to pa# 2012 0227 4899; updates to structural detail including: stair details, shade pocket framing, details for balconyDetails
revision to pa# 2012 0227 4899; updates to structural detail including: stair details, shade pocket framing, details for balcony | |
| Jan 21, 2015 | Completed final sign-off Jun 2015 | 34 Belgrave Av | replace existing sideyard landscape stairDetails
replace existing sideyard landscape stair | $8,000 |
| Jun 19, 2014 | Completed final sign-off Oct 2017 | 310 Walnut St | horizontal rear addition at garage, 1st & 2nd floor. 2 new decks, 1 new staircase to access the backyard. addition at north side for garage & 1st floor.Details
horizontal rear addition at garage, 1st & 2nd floor. 2 new decks, 1 new staircase to access the backyard. addition at north side for garage & 1st floor. | $225,000 |
| Aug 14, 2013 | Completed final sign-off Apr 2014 | 2686 Union St | revision to appl #2012.0829.8540 - add (n) access panel to attic, across (e) stairway to prevent illegally occupy the attic.Details
revision to appl #2012.0829.8540 - add (n) access panel to attic, across (e) stairway to prevent illegally occupy the attic. | $1,000 |
| May 31, 2013 | Completed final sign-off Aug 2016 | 1164 Fulton St | restore facade to original design per historic photo renovate interiors & new 200 sf stair penthouse at roof. reduce unit count from 4 to 2.Details
restore facade to original design per historic photo renovate interiors & new 200 sf stair penthouse at roof. reduce unit count from 4 to 2. | $300,000 |
| Aug 29, 2012 | Completed final sign-off Apr 2014 | 2686 Union St | demolition of non load bearing walls, partitions as indicated, new kitchen and bath remodel, new stair access to e attice space. work in condominium unit only. no work at 1st and 2nd floorsDetails
demolition of non load bearing walls, partitions as indicated, new kitchen and bath remodel, new stair access to e attice space. work in condominium unit only. no work at 1st and 2nd floors | $65,000 |
| Feb 27, 2012 | Completed final sign-off Dec 2016 | 25 Belgrave Av | remodel & horizonal addition to include: (n) basement with 2 car garage beneath (e) 1st floor. 1st flr: remodel for (n) media rm. 2nd flr: remodel living spaces. 3rd flr: remodel bedrm & bath. roof: (n) roof deck & stair penthouse.Details
remodel & horizonal addition to include: (n) basement with 2 car garage beneath (e) 1st floor. 1st flr: remodel for (n) media rm. 2nd flr: remodel living spaces. 3rd flr: remodel bedrm & bath. roof: (n) roof deck & stair penthouse. | $400,000 |
| Sep 6, 2011 | Completed final sign-off May 2018 | 840 Union St | remodel of an (e) 3-story, 2-unit residence, including: 1) conversion of a portion of the (e) basement from storage to habitable area; 2) interior remodel at all floors; 3) exterior elevations alterations; 4) replacement of (e) exterior stair; 5) (n) site stair & landscaping.Details
remodel of an (e) 3-story, 2-unit residence, including: 1) conversion of a portion of the (e) basement from storage to habitable area; 2) interior remodel at all floors; 3) exterior elevations alterations; 4) replacement of (e) exterior stair; 5) (n) site stair & landscaping. | $275,000 |
| Jan 7, 2011 | Completed final sign-off Apr 2012 | 1585 16th Av | repair misc. dry rot at front entry stair inside bldg. less than 50% in-kind. remove (e) vinyl siding at front of bldg. and install with wood siding at upper & stucco at lower. replace rear siding in-kind. replace nine windows and one front door in-kind, windows shall have u-factor less than 0.40.Details
repair misc. dry rot at front entry stair inside bldg. less than 50% in-kind. remove (e) vinyl siding at front of bldg. and install with wood siding at upper & stucco at lower. replace rear siding in-kind. replace nine windows and one front door in-kind, windows shall have u-factor less than 0.40. | $30,000 |