Driven Construction Llc
- Based in
- Alameda
- On San Francisco permits
- Sep 2025 to Jul 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 2 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 21 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2026 | In progress issued Jun 2026 | 2921 20th Av | interior remodel of (e) 2 stories sfd: reconfiguration of bathrooms and interior stair modifications. new wet bar at lower level, minor exterior modifications including window adjustments reduction in size of 1 window at lower level(left side) and minor relocation of 2 bathrooms windows at main le..Details
interior remodel of (e) 2 stories sfd: reconfiguration of bathrooms and interior stair modifications. new wet bar at lower level, minor exterior modifications including window adjustments reduction in size of 1 window at lower level(left side) and minor relocation of 2 bathrooms windows at main le.. | $150,000 |