Back to kitchen remodel contractors
Drew Maran Construction/Design Inc.
- Based in
- Palo Alto
- On San Francisco permits
- Mar 2005 to Aug 2011
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 270 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2011 | Completed final sign-off Oct 2011 | 2134 Green St | #6- rot repair: repair rot at kitchen sliding door, new door, no new wall, no new ceiling work on this permitDetails
#6- rot repair: repair rot at kitchen sliding door, new door, no new wall, no new ceiling work on this permit | $1,500 |
| Jul 7, 2010 | Completed final sign-off Oct 2011 | 2134 Green St | interior renovation to unit# 6 on 2 floors (3rd and 4th floor). kitchena and bath and stair improvement. add 1 full bathrm. mezzaninie extension at interior of unit lnly. no increase to bldg envelope. no increse to conditioned space. no exterior work.Details
interior renovation to unit# 6 on 2 floors (3rd and 4th floor). kitchena and bath and stair improvement. add 1 full bathrm. mezzaninie extension at interior of unit lnly. no increase to bldg envelope. no increse to conditioned space. no exterior work. | $234,500 |